Memo Number |
Title |
Author(s) |
Date |
Original PDF |
1 |
RFI Emissions from Vac Ion Pumps |
L. A. Beno |
11/11/92 |
|
2 |
RFI at Saint Croix due To FAA RADAR at L-Band |
D. S. Bagri |
11/11/92 |
|
3 |
US Frequency Allocation and Footnotes for Radio Astronomy and Passive Radio Services |
W. D. Brundage |
11/07/94 |
|
4 |
Tests of the MIT 600 MHz Impulse Detector |
C. Janes |
01/95 |
|
5 |
Strong Interference at the VLA, 1994 |
C. Janes |
02/95 |
|
6 |
Index of Interference Memos |
S. Lucero |
02/95 |
|
7 |
Digital Spectrometer / Autocorrelator for Monitoring RFI |
C. Janes, C. Broadwell, L. Beno |
06/95 |
|
8 |
The VLA IF Interference Monitor |
C. Janes, R. Jones, D. Jenkins |
06/95 |
|
9 |
Presentation of VLA Interference Information on the Web |
N. Lui, D. Jenkins |
09/95 |
|
10 |
Frequency Allocations and Footnotes for Radio Astronomy and Passive Radio Services |
B. Lilie, W. D. Brundage |
07/96 |
|
11 |
Interference at 1330 MHz |
E. Brinks, C. Janes, P. Lilie |
04/05/94 |
|
12 |
A Proposal To Control Local Interference at the VLA |
B. Brundage, C. Janes |
04/25/94 |
|
13 |
Harmonic Emissions Testing of Hand-Held Radios |
J. Sinnott |
01/97 |
|
14 |
Radiated RFI Emissions from the ALMA Test Correlator and 1.6 GHz Digitizers and Comparison To Harmful Levels To VLA Observations |
R. Armendariz |
11/15/00 |
|
15 |
Performance Characterization of the 1-18 GHz Ailtech-Stoddart NM67-CC17 Reciever System Used as Part of the Continous RFI Environmental Monitoring System (EMS) at the VLA |
R. Armendariz, R. Schmidt |
10/02/00 |
|
16 |
Environmental Monitoring Station: Ailtech-Stoddart Receiver Calibration & Integration of NM-67 and CCI-7 and Satellite Tracking Station: Implementation |
R. J. Schmidt |
11/27/00 |
|
17 |
NRAO Clock Recovery Test Fixture Senior Design Project |
F. Martinez, M. Nunez, S. J. Padilla |
05/09/01 |
Original |
18 |
Radio Frequency Interference Satellite Tracking System (STS) |
L. Noice, R. Schmidt, E. Szpindor, H. Vahle |
05/05/01 |
|
19 |
Radio Frequency Interference Environmental Monitoring System (EMS) |
A. Nguyen, T. Nguyen, K. Shores |
05/05/01 |
|
20 |
KP-VLBA RFI at 610.75 MHz in Radio Astronomy Primary Allocated Band |
D. Haenichen |
07/26/01 |
|
21 |
Digital Spectrometer Autocorrelator 1- 18 GHz Down Converter, EMS Automation, Rohn Tower Repair, and TV Action Updates |
N. Thomas |
07/27/01 |
Original |
22 |
Radiated RFI Emission Tests of the Motorola 162.025 MHz Radios Currently Used at the VLA and of the Kenwood 410.55/419.55 MHz Radios Proposed as a Replacement |
R. Armendariz |
06/18/01 |
Original |
23 |
EVLA Radio Frequency Interference Survey from 1-8 GHz, Analysis of EMS System Noise Figure and VLA L-Band Feed Horns |
E. Reynolds |
12/28/01 |
|
24 |
Tests of DW8 RFI Monitor |
C. Patscheck, D. Mertely |
07/01/02 |
|
25 |
Far Sidelobes of VLA & VLBA 25m Antennas at λ 18 cm |
V. Dhawan |
[08/02] |
Original |
26 |
Shielding Tests |
C. Patscheck |
08/02 |
|
27 |
L-Band Shielding Characteristics Of Several Areas of the VLA Site |
C. Patscheck |
08/12/02 |
|
28 |
Shielding Characteristics of the Correlator Room, SLOB, Pedestal and Vertex Rooms at the VLA Site |
C. Patscheck |
08/16/02 |
Original |
29 |
ATF Shielding Improvements |
C. Patscheck, R. Ridgeway |
08/22/02 |
Original |
30 |
Computer Emissions Test Summary |
C. Patscheck |
09/16/02 |
|
31 |
EVLA Shielded Chamber Power Offset Test Notes |
C. Patscheck, R. Ridgeway |
10/31/02 |
|
32 |
EVLA Shielded Chamber Characterization, Radiated Emissions Test Protocol, RF Shielding Characterisitcs of Buildings at the VLA Site, and Radiated Emissions Test of MCB Ethernet Switchgear |
C. S. Patscheck |
12/05/02 |
|
33 |
A Frequency Independent Conical Logarithmic Spiral Antenna for Observation of the Atacama Large Millimeter Array (ALMA) Test Site |
S. Choudhary, R. Ridgeway, K. Shores |
09/22/03 |
|
34 |
Notes on RFI Emissions Levels |
R. Perley |
12/21/06 |
Original |
35 |
VLA Site Generated RFI Control Plan |
D. Mertely, R. Perley |
12/11/06 |
Original |
36 |
EVLA Vertex Room Sourced RF Propagation Losses |
D. Mertely, C. Frentzel, B. Hayward |
07/01/08 |
Original |
37 |
VLBA-PT Station Building Sheilding Test Report |
D. Mertely, C. Barham |
06/02/09 |
Original |
38 |
VLBA-PT Station Building Shielding Test Report Addendum: Shielding Interpolaration and Extrapolation into Untested Frequency Regions |
D. Mertely, S. Durand |
12/03/09 |
Original |
39 |
VLA Control Building West Shielded Room Shielding Test Report |
D. Mertely, S. Fennell |
05/09/18 |
|