MMA Front End Documents

These documents are not a formal memo series, but rather are a collection of various items,
including many official NRAO documents, gathered around this topic by John Webber.


Memo Submission

Contact the Library via e-mail if you have any trouble with the scans posted here.

Memo Number Title Author(s) Date
1 A Total Power Radiometer With Continuous Calibration in Frequency Domain M. W. Pospieszalski 01/22/96
2 The Temporal Power Spectrum of Atmospheric Fluctuations Due to Water Vapor O. P. Lay 07/19/96
3 Phase Calibration and Water Vapor Radiometry for Millimeter-wave Arrays O. P. Lay 07/19/96
4 Proposed MMA mm Frequency Coverage - 09/12/96
5 The Effect of a Proposed 94.5 GHz Space Based, Cloud-Profiling Radar on Millimeter-Wave Radio Astronomy A. R. Thompson, J. E. B. Ponsonby [11/96]
6 Notes on the Proposed 94.5GHz Space Based Cloud Profiling Radar and Its Impact on MM-wave Radio Astronomy J. E. B. Ponsonby 11/19/96
7 MMA Receivers J. Payne 01/23/97
8 MMA Receiver Group J. Welch 01/23/97
9 [MMA Rx Plan] - 01/24/97
10 Informal MMA Receiver Meeting - 01/24/97
11 A Suggested Receiver Layout for the MMA Antenna J. Lugten, J. Welch 03/07/97
12 Visit to Princeton Physics Department About Cryogenics - 06/27/97
13 Reminder: MMA Rx Group Meeting D. Emerson 09/17/97
14 Minutes of the MMA Receiver Advisory Group Meeting, 08:00 MST, September 17th 1997 - 09/23/97
15 Cryogenics Options for the MMA L. D'Addario 09/25/97
16 Review of Gifford-McMahon Refrigerators for 4K L. D'Addario 09/25/97
17 Notes on Visit to APD Cryogenics, 29 October 1997 L. D'Addario 10/29/97
18 Agenda for MMA Receiver Group Meeting, 98/01/21 D. Emerson 01/20/98
19 Preliminary Cooling Load Estimates for MMA Receivers L. R. D'Addario 01/21/98
20 Capabilities in MM- and Submm-wave Receiver Technology - 02/98
21 Feasibility of Receivers for the LSA K. Jacobs, et al. 02/02/98
22 MMA/LSA - 03/06/98
23 Iwatani Pulse Tube Refrigerator: Visit From Local Rep L. R. D'Addario 04/01/98
24 LSA/MMA Receiver Group Meeting in Leiden - 06/08/98 - 06/09/98
25 MMA Receiver Development J. Payne 12/07/98
26 4K Refrigerators for Evaluation Receivers J. M. Payne 01/07/99
27 Pulse Tube Refrigerater Development - Decision Document L. D'Addario 01/10/99
28 MMA Total Power: Correlation Receivers S. Thacker 01/14/99
29 Re: LMA Instrumentation A. Kerr 01/28/99
30 Discussions of Interfaces to Support Evaluation Receivers Held in Tucson on 1999-01-23 L. R. D'Addario 02/05/99
31 MMA Total Power: Correlation Receivers Rev 3 S. Thacker 03/02/99
32 Receiver Meeting, Tucson Feb 22 R. Booth 03/11/99
33 Choice of First IF for the MMA A. R. Kerr 05/29/99
34 Joint Receiver Development Group First Meeting - First Meeting - 09/30/99
35 Minutes of First Joint Receiver Development Group (JRDG) Meeting - 09/30/99
36 ALMA Phase 1 Joint Receiver Work Program - 10/02/99
37 ALMA Receiver Conceptual Design: Guidelines for Receiver Configuration Meeting W. Wild, J. M. Payne 10/15/99
38 Draft ALMA Phase I Receiver Work Program J. Webber 10/19/99
39 2nd Meeting of the ALMA Joint Receiver Design Group (JRDG) - 12/02/99 - 12/03/99
40 ALMA Optics A. Baryshev, W. Wild 01/27/00
41 Comments on the Document "ALMA Optics," of A. Baryshev and W. Wild A. R. Kerr 01/27/00
42 Joint Receiver Design Group Members & Others - 02/02/00
43 3rd Meeting of the ALMA Joint Receiver Design Group (JRDG) - 03/07/00
44 Forwarded Message From Neal J. Evans II A. Wootten 03/17/00
45 3rd Meeting of the ALMA Joint Receiver Design Group (JRDG) - 03/20/00
46 Reply To Tony Kerr's Comments on Memo 301 J. Lamb 04/00
47 JRDG Telecon - 04/27/00
48 ALMA Receiver Subsystem Top-level Requirements and Specifications W. Wild, J. Payne 05/19/00
49 Thursday's JRDG Teleconference J. Neighbours 05/20/00
50 JRDG Telecon - 05/25/00
51 Performance of the Spacek Mixers - 06/00
52 JRDG Telecon - 06/29/00
53 1/f noise J. Webber 06/29/00
54 Brief Reports for JRDG of 6-29-00 - 06/29/00




Modified on Thursday, 12-Jul-2018 16:46:58 EDT by Library Staff