Spectral Processor Memos

Memo Submission

Contact the Library via e-mail if you have any trouble with the scans posted here.

Memo Number Title Author(s) Date
1 Draft Specifications for a Proposed RFI-Cancelling Pulsar Spectrometer W. Brundage 09/10/81
2 Letter Regarding Considerations for Pulsar System for the 300-Foot V. Boriakoff 10/31/81
3 Pulsar Data Acquisition System T. Hankins 10/30/81
4 Recommended Hardware Improvements/Acquisitions for NRAO J. M. Cordes 10/81
5 Proposed Pulsar Receiver R. Lacasse 11/16/81
6 JPL 216 Channel 20 MHz Bandwidth Digital Spectrum Analyzer G. A. Morris, Jr., H. C. Wilck -
7 Biplex Pipelined FFT R. F. Emerson -
8 Interference Characteristics W. Brundage 01/15/82
9 The Multi-Channel Spectrum Analyzer A. M. Peterson, K. S. Chen -
10 Specifications Update 1 W. D. Brundage 06/24/82
11 Letter Following Up On The Telephone Conference on FFT Machines V. Boriakoff 06/14/82
12 Specifications Update 2 W. D. Brundage 09/82
13 Progress Report W. D. Brundage 09/20/82
14 Comments on the Proposed NRAO Pulsar Signal Processor J. M. Cordes 10/14/82
15 Specification Meeting 1 December 1982 Preliminaries D. Stinebring 11/19/82
16 400 MHz Interference Survey J. R. Fisher 12/21/82
17 First Draft of a Program Plan R, Lacasse 03/31/83
18 Summary of Scientific Specification Meeting 1 December 1982 W. D. Brundage, D. R. Stinebring 06/03/83
19 June 17 Meeting R. Lacasse 06/13/83
20 Specifications Update 3 W. Brundage, D. Stinebring 07/20/83
21 IF Converter for the Spectral Processor W. Brundage 10/19/83
22 Spectral Processor Design R. Fisher 06/25/84
23 Hardware Notes R. Fisher, R. Weimer 01/03/85
24 More Detailed Spectral Processor Design J. R. Fisher 01/05/85
25 Some Experiments with an Integer FFT R. Fisher 02/13/85
26 Window Multiplier Addressing Sequences R. Fisher 03/22/85
27 Dedispersion with an Accumulator Memory Address Generator R. Fisher 05/24/85
28 Hardware-Software Interface R. Fisher 11/17/87
29 Summary of Discussion on Digital Interface and Displays in the Spectral Processor IF Drawers R. Fisher 02/02/88
30 Control and Data Flow in Spectral Processor System at the 300-ft R. Fisher 03/04/88
31 Accumulator Memory Controller 1: Communications with Rack Controller R. Lacasse 04/05/88
32 More Accumulator Control Bits R. Lacasse 06/14/88
33 Caesar Keywords Associated with the Spectral Processor J. R. Fisher 06/23/88
34 Pulsar Timing Logic J. R. Fisher, R. Foster 01/03/89
35 A Test of a Polarization Observing Mode on the NRAO Spectral Processor M. McKinnon 04/15/94
36 Polarization Calibration of the NRAO 140-ft Telescope with Feed Rotation M. McKinnon 05/31/94




Modified on Friday, 01-Oct-2021 12:42:57 EDT by Library Staff