Miscellaneous, Unnumbered, GBT Reports

Memo Submission

This page lists GBT miscellaneous unnumbered internal reports, i.e. reports, memos, etc. that were not issued as part of one of the formal, numbered NRAO series.

Misc. Memos by instrument: 300 ALMA GBT VLA VLBA

Contact the Library via e-mail if you have any trouble with the scans posted here.


Title Author(s) Date
Green Bank Telescope: Project Summary - 02/20/89
National Radio Astronomy Observatory, Green Bank Telescope: Small Subreflector Specification (M2) - 07/18/90
Personnel Assignments to the GBT R. D. Hall, G. A. Seielstad, P. A. Vanden Bout 03/05/91
Pointing Coefficients for Single Subreflector Optics S . Srikanth 03/06/91
First Five Receivers for the GBT G. Seielstad 03/07/91
Green Bank Telescope Groundbreaking Ceremony 05/01/91
GBT Science Working Group Minutes, May 14, 1991 05/14/91
GBT Science Working Group Minutes, June 11, 1991 06/11/91
New Spectrometer for the GBT A. Dowd 10/07/91
An FFT Based Power Spectrometer Davenport 10/07/91
Original Proposal Concept G. Seielstad 10/07/91
GBT Science Working Group Minutes, October 15, 1991 10/15/91
Preliminary Design Considerations S. Shears 11/18/91
GBT Science Working Group Minutes, November 19, 1991 11/19/91
Observer Monitor and Control Requirements J. R. Fisher, F. J. Lockman 02/92
GBT Receiver Plan [F. J. Lockman] 02/13/92
GBT Spectrometer Requirements 05/18/92
Background Information for the SWG Meeting Scheduled for 27 July 1993 07/19/93
GBT Scientific Working Group Meeting of September 20, 1994 J. Lockman, R. Escoffier 09/94
Dynamic Analysis of the GBT D. E. Hogg 05/05/95
Major Construction: The Green Bank Telescope, GBT Program Plan 1996 - 1996
Green Bank Telescope Monthly Reports, 1998 - 1998
GBT Budget B. Porter 02/98
Green Bank Telescope Monthly Reports, 1999 - 1999
Differential Measurements Of GBT Tipping Structure Retrorefiector Vibrational Motions M. A. Goldman 09/01/99
Confirmation Of S. Srikanth’s Pointing Coefficients For GBT Single Subreflector Optics M. A. Goldman 09/28/99
First Differential (x,y,z) Measurements of the GBT Feed Arm and Future Plans D. H. Parker 11/30/99
First NPH6 hydrostatic level field measurements and future plans D. H. Parker 11/30/99
A Program for Developing the 3 mm Observing Capability of the Green Bank Telescope P. R. Jewell, M. M. McKinnon 12/02/99
Green Bank Telescope Monthly Reports, 2000 - 2000
Beam Forming Array Technical Working Group P. Jewell 11/00
Beam-Forming Array (L-Band Prototype) - 04/01
Local RFI Mitigation Interference Protection Group - 04/01
RFI Excision Research (MRI) - 04/01
Preliminary Design for a GBT 1 cm Receiver G. Watts, R. Norrod, P. Jewell, A. Shelton 01/02
Correlator Sensitivity Degradation Due to Mis-balancing F. Schwab 08/02
Sample of Baseline Stability of the 2-3 GHz GBT Receiver: Project TAST_SB_02119 R. Fisher 12/03/02
Review Panel Report for the GBT Precision Telescope Control System In-Progress - 12/03/02




Modified on Thursday, 02-May-2024 14:41:23 EDT by Library Staff