Title Author(s) Date
Green Bank Telescope: Project Summary - 02/20/89
National Radio Astronomy Observatory, Green Bank Telescope: Small Subreflector Specification (M2) - 07/18/90
Personnel Assignments to the GBT R. D. Hall, G. A. Seielstad, P. A. Vanden Bout 03/05/91
First Five Receivers for the GBT G. Seielstad 03/07/91
Green Bank Telescope Groundbreaking Ceremony 05/01/91
GBT Science Working Group Minutes, May 14, 1991 05/14/91
GBT Science Working Group Minutes, June 11, 1991 06/11/91
New Spectrometer for the GBT A. Dowd 10/07/91
An FFT Based Power Spectrometer Davenport 10/07/91
Original Proposal Concept G. Seielstad 10/07/91
GBT Science Working Group Minutes, October 15, 1991 10/15/91
Preliminary Design Considerations S. Shears 11/18/91
GBT Science Working Group Minutes, November 19, 1991 11/19/91
Observer Monitor and Control Requirements J. R. Fisher, F. J. Lockman 02/92
GBT Receiver Plan [F. J. Lockman] 02/13/92
GBT Spectrometer Requirements 05/18/92
Background Information for the SWG Meeting Scheduled for 27 July 1993 07/19/93
GBT Scientific Working Group Meeting of September 20, 1994 J. Lockman, R. Escoffier 09/94
Dynamic Analysis of the GBT D. E. Hogg 05/05/95
Major Construction: The Green Bank Telescope, GBT Program Plan 1996 - 1996
Beam Forming Array Technical Working Group P. Jewell 11/00
Beam-Forming Array (L-Band Prototype) - 04/01
Local RFI Mitigation Interference Protection Group - 04/01
RFI Excision Research (MRI) - 04/01
Preliminary Design for a GBT 1 cm Receiver G. Watts, R. Norrod, P. Jewell, A. Shelton 01/02
Correlator Sensitivity Degradation Due to Mis-balancing F. Schwab 08/02
Sample of Baseline Stability of the 2-3 GHz GBT Receiver: Project TAST_SB_02119 R. Fisher 12/03/02
Review Panel Report for the GBT Precision Telescope Control System In-Progress - 12/03/02