Title |
Author(s) |
Date |
Observing with the 36-ft Millimeter-wave Telescope |
B. E. Turner, R. H. Rubin |
1968 |
Pointing and Focus Calibration of the 36-foot Telescope |
J. Schraml |
09/69 |
Data Recording and Processing Computer for NRAO 36' Telescope |
D. Buhl |
07/70 |
Status Report on 1 Millimeter Project |
J. D. G. Rather |
03/25/71 |
Year End Status Report on 1 Millimeter Project |
J. D. G. Rather |
03/23/72 |
New 3MM-λ Receivers |
A. R. Kerr |
06/13/72 |
Absolute Calibration of Millimeter Continuum Observations |
B. L. Ulich |
04/19/73 |
Spectral Line Calibration with Cassegrain Receivers |
B. L. Ulich |
09/12/75 |
An Observer's Guide to the 36-Foot Telescope |
- |
04/76 |
A Guide to the 36-Foot Instrumentation |
J. M. Payne |
06/76 |
Present Telescope Tracking Constraints |
J. M. Hollis |
10/25/77 |
Blanking Noise |
B. L. Ulich |
04/23/79 |
Polarimeter Noise Calculations |
B. L. Ulich |
05/06/79 |
Calibration with Quasi-Optics Box Installed |
B. L. Ulich |
09/18/79 |
CO Spectral Line Calibration with New Fabry-Perot Filter |
R. Howard |
11/06/79 |
Absolute Calibration Errors |
B. L. Ulich |
11/27/79 |
12-m Projects |
J. M. Payne |
03/28/83 |
Attempts to Improve the Sensitivity of the 3 mm Cassegrain Receiver |
R. J. Howard |
06/22/83 |
Optical Depth Measurements |
J. M. Payne, B. Stobie |
02/03/84 |
12-m Telescope Calibration |
J. M. Payne, P. J. Rhodes, C. J. Salter, E. B. Stobie |
03/26/84 |
12-m Telescope Calibration |
J. M. Payne, C. J. Salter |
04/15/84 |
Electronics Projects in Tucson |
J. Payne |
05/22/84 |
Update of Spectral Line Calibration Procedure |
P. Jewell |
06/12/84 |
Procedure for Obtaining OFF+-OFF- For Beam Switching Observations |
P. R. Jewell |
06/14/84 |
Telescope Test Time |
P. R. Jewell |
07/31/84 |
8-Beam Receiver |
M. Balister |
09/25/84 |
Focal-Plane Array |
P. Jewell, J. Payne, C. Salter |
10/11/84 |
1 mm Polarimeter for the 12 m Telescope |
R. Barvainis |
06/20/85 |
Continuum Mapping with the 12-M Telescope |
C. J. Salter |
07/85 |
Shield for Specular Reflection from the Sun |
M. A. Gordon |
08/27/85 |
Calibration Scheme for the New Digital Backend |
C. J. Salter, P. R. Jewel |
08/27/85 |
345 GHz Receiver Used at 270-312 GHz |
J. Payne |
10/17/85 |
Trial and Error at the 12-Meter, A Green Bank Talk |
J. W. Findlay |
10/28/85 |
High Frequency Observations |
J. Payne |
01/06/86 |
Notes on Millimeter Receiver Work for Tucson |
A. R. Kerr |
03/25/86 |
Digital Backend Signal Processing |
P. R. Jewel |
04/27/86 |
1986 Summer Shutdown Projects |
P. R. Jewel |
05/12/86 |
12-meter Control System Definition |
- |
05/23/86 |
Sterling Mount on 12 M |
J. Payne |
09/11/86 |
Observing Experience. Program D149 |
M. A. Gordon |
11/29/86 |
High Frequency Observations |
P. R. Jewel |
01/05/87 |
Miscellaneous |
P. R. Jewel |
01/05/87 |
Bolometer |
J. Payne |
01/26/87 |
Visitor Information: The NRAO 12-Meter Millimeter-Wave Telescope |
- |
03/87 |
Technical Summary: Millipol on the NRAO 12 Meter Telescope |
D. Clemens |
03/14/87 |
High Frequency Performance |
J. Payne |
03/17/87 |
Continuum Data Analysis Using Vane Calibration |
P. R. Jewel |
04/19/87 |
Work at the 12-Meter Telescope July 17 - 23, 1987 |
J. W. Findlay |
08/04/87 |
Continuum Data Analysis Using Vane Calibration |
P. R. Jewel |
04/19/87 |
12-m Antenna Noise Pickup |
J. Lamb |
06/01/87 |
12-m Optics |
J. M. Payne |
08/18/87 |
8-Feed Rotation |
J. M. Payne |
08/03/87 |
Paint for the 12 m Feedlegs |
P. R. Jewel |
08/21/87 |
Routing of Subreflector SIG/REF Signals |
P. R. Jewel |
09/25/87 |
Sideband Smear |
J. Payne |
11/16/87 |
High Frequency Mixer Performance: How to Improve It? |
P. R. Jewel |
02/03/88 |
VLBA-12 Meter Interconnection |
D. Ross |
02/24/88 |
A Possible Problem with the Focus Drive/Readout |
P. R. Jewel |
03/30/88 |
Continuum Vane Calibration, etc. |
P. R. Jewel |
04/06/88 |
12 M Telescope Receiver and Calibration Status |
- |
05/88 |
SIS Receiver Plans |
A. R. Kerr, J. W. Lamb, J. M. Payne |
06/03/88 |
230 GHz SIS Rx |
J. M. Payne |
09/13/88 |
Pointing Projects |
P. R. Jewel |
02/23/89 |
More On Pointing |
P. R. Jewel |
02/24/89 |
Pointing Hysteresis |
P. R. Jewel |
03/13/89 |
Pointing Nastiness |
P. R. Jewel |
03/21/89 |
Further Tests with the Laser Quadrant Detector |
P. R. Jewel |
04/17/89 |
70-115 GHz Receiver and 4 K Systems |
J. Payne |
04/21/89 |
Plan for Pointing Improvement |
P. R. Jewel |
05/14/89 |
Summary of Pointing Meeting on Monday, May 22 |
P. R. Jewel |
05/25/89 |
Pointing |
J. Payne |
05/30/89 |
Quadrant Detector |
J. Payne |
06/12/89 |
230 GHz Insert |
J. Payne |
10/18/89 |
12m Telescope Receiver Requirements |
D. Emerson |
11/09/89 |
Tests of 12-m 4 K System in Green Bank |
J. M. Payne |
11/13/89 |
12 Meter Telescope SIS Mixers |
L. M. Ziurys |
01/17/90 |
SIS Receivers for the 12-Meter Telescope |
A. R. Kerr, J. Lamb, J. Payne |
03/26/90 |
Time Scales for Millimeter Receivers |
J. Payne |
03/26/90 |
Old 3 mm Schottky Receiver |
D. T. Emerson, P. R. Jewell, J. M. Payne |
04/02/90 |
Spectral Line Analysis System For The NRA0 12M Millimeter-Wave Telescope |
- |
08/90 |
User's Manual For The NRA0 12M Millimeter-Wave Telescope |
- |
08/90 |
GAG Software at the 12m |
J. Mangum |
03/10/94 |
12m Spectral Line Unipops Examplebook |
- |
05/03/95 |
A Report on the Manufacture of the Tucson 8-Beam, 230 GHz Feed Horn |
V. Summers |
02/14/95 |
Fourier Analysis of 12 m Structural Tilt Measurements |
J. Wren |
05/18/95 |
On The Fly Observing at the 12m |
J. Mangum |
05/20/96 |
Observing with the NRAO 8-Beam SIS Receiver |
J. Mangum |
05/29/96 |
User's Manual For The NRA0 12M Millimeter-Wave Telescope |
J. Mangum |
01/18/00 |