Memo Number |
Title |
Author(s) |
Date |
1 |
A Microwave Transmission Link in New Mexico for the National Radio Astronomy Observatory |
K. Bullington |
10/31/83 |
2 |
Minutes of the VLBA Electronics Group Meeting on November 16, 1983 |
M. Balister |
11/22/83 |
3 |
VLBA Frequency Coverage |
L. R. D'Addario |
11/28/83 |
4 |
Local Oscillator System Design |
L. R. D'Addario |
12/26/83 |
5 |
Maser Reliability in the DSN |
A. Moffet |
01/04/84 |
6 |
Cryogenics Reliability |
M. Balister |
01/16/84 |
7 |
Design of LO System in VLBA Memo No. 303 |
D. Thompson |
00/00/00 |
8 |
Minutes of the VLBA Electronics Group Meeting on January 19, 1984 |
M. Balister |
01/24/84 |
9 |
Experience with CTI Model 21 Refrigerators at Hat Creek |
D. Backer, T. Lum |
02/84 |
10 |
Minutes of the VLBA Electronics Group Meeting - February 16, 1984 |
M. Balister |
02/22/84 |
11 |
VLBA Electronics Meeting, March 15, 1983 |
A. R. Thompson |
03/19/84 |
12 |
140-ft K-Band Maser Noise Temperature |
C. Brockway |
03/26/84 |
13 |
VLBA Electronics Meeting, April 19, 1984 |
A. R. Thompson |
04/25/84 |
14 |
VLBA Electronics Group Meeting, May 17, 1984 |
A. R. Thompson |
05/23/84 |
15 |
VLBA Frequency Coverage: Final Specification |
L. R. D'Addario, R. C. Walker |
06/12/84 |
16 |
VLBA Electronics Group Meeting, June 14, 1984 |
A. R. Thompson |
06/18/84 |
17 |
Meeting on Antenna Building Requirements |
A. R. Thompson |
06/21/84 |
18 |
Construction Plan for VLBA Electronics |
A. R. Thompson, M. Balister |
06/84 |
19 |
VLBA Electronics Group meetings of August 6 & September 6 |
A. R. Thompson |
09/10/84 |
20 |
Conference on Quality Control in Manufacturing and Assembly of Cryogenic Refrigerators |
H. Brown |
09/10/84 |
21 |
Rework Being Performed by CTI |
H. Dill |
10/05/84 |
22 |
Report on CTI Model 22 Refrigerator Test |
R. Norrod |
10/12/84 |
23 |
CTI-Cryogenics Action Plan |
L. R. Audette |
10/09/84 |
24 |
VLBA Electronics Division Meeting, October 11, 1984 |
D. Thompson |
10/12/84 |
25 |
Meeting on Vertex Room Planning, Oct 24, 1984 |
D. Thompson |
10/24/84 |
26 |
Local Oscillator Link for Pie Town Antenna |
D. L. Narayana |
09/84 |
27 |
Symptom Notes for the Model 22 |
H. Dill |
10/31/84 |
28 |
Power for Receiving Electronics Required at Each VLBA Site. |
A. R. Thompson |
11/14/84 |
29 |
VLBA Electronics Meeting, November 8, 1984 |
D. Thompson |
11/19/84 |
30 |
I.F. Signal Processing: Preliminary Specifications |
L. R. D'Addario |
11/15/84 |
31 |
Model 22 Refrigerators |
H. Dill |
12/05/84 |
32 |
Front Ends for 23 and 43 GHz |
A. R. Thompson |
12/04/84 |
33 |
See VLB Array Memo No. 413 |
D. Thompson |
12/07/84 |
34 |
Report on CTI Model 22 Refrigerator Test |
R. Norrod |
01/11/85 |
35 |
VLBA Electronics Meeting, Jan 10, 1985 |
D. Thompson |
01/17/85 |
36 |
Phase Calibration Injection |
A. E. E. Rogers |
02/04/85 |
37 |
Return of Reworked Model 22 Units |
H. Dill |
02/07/85 |
38 |
VLBA Electronics Meeting, Feb 7 1985 |
D. Thompson |
02/11/85 |
39 |
Dynamic Range and Interference Thresholds in the Front-End and IF Units |
A. R. Thompson, E. Schlecht |
03/01/85 |
40 |
VLBA Electronics Meeting, March 7, 1985 |
D. Thompson |
03/14/85 |
41 |
VLBA Electronics Meeting, April 4, 1985 - Discussion of the Front-End Monitor and Control System |
D. Thompson |
04/10/85 |
42 |
MLBA Vertex Room Interfacing |
R. Norrod |
04/08/85 |
43 |
Front-End Monitor and Control |
S. Weinreb |
04/23/85 |
44 |
Meeting on Front-End Interface, April 30, 1985 |
D. Thompson |
05/02/85 |
45 |
VLBA Electronics Meeting, May 2, 1985 |
D. Thompson |
05/06/85 |
46 |
CTI Model 21/22 Cryogenic Refrigerator Progress Report |
R. A. Kriss, C. Moore |
04/85 |
46A |
Cryogenics for VLBA |
T. Clark |
05/15/85 |
47 |
VLBA Electronics Meeting, June 13, 1985 |
D. Thompson |
06/14/85 |
48 |
VLBA Construction for the Period 1985-6 |
D. Thompson |
06/19/85 |
49 |
VLBA Electronics Meeting, July 11, 1985 |
D. Thompson |
07/12/85 |
50 |
Thermal Behavior of External Front Ends |
E. Schlecht |
07/19/85 |
51 |
VLBA Electronics Meeting, September 5, 1985 |
D. Thompson |
09/06/85 |
52 |
Electronics Meeting, October 3, 1985 |
D. Thompson |
10/07/85 |
53 |
There are Four VLBA Standard Interface Packaging Problems |
- |
10/02/85 |
54 |
Interference from Current Loops |
A. Moffet |
10/04/85 |
55 |
Electronics Meeting, November 7, 1985 |
D. Thompson |
11/08/85 |
56 |
Front-End Design Changes |
S. Weinreb |
11/25/85 |
57 |
VLBA Electronics Meeting, December 5, 1985 |
D. Thompson |
12/09/85 |
58 |
VLBA Electronics Meeting, January 9, 1986 |
D. Thompson |
01/13/86 |
59 |
Rack and Module Plan for VLBA Electronics |
D. Thompson |
01/22/86 |
60 |
Front-End Changes |
S. Weinreb |
02/11/86 |
61 |
VLBA Electronics Meeting, Feb. 6, 1986 |
D. Thompson |
02/11/86 |
62 |
Notes on Gain Distribution in the VLBA Front End and Converter Systems |
E. Schlecht |
02/14/86 |
63 |
VLBA Electronics Meeting, March 6, 1986 |
D. Thompson |
03/11/86 |
64 |
Proposed Cables for the VLBA Receiving Station |
A. R. Thompson |
04/03/86 |
65 |
VLBA Electronics Meeting, April 3, 1986 |
A. R. Thompson |
04/07/86 |
66 |
Names and Type Numbers of VLBA Modules |
A. R. Thompson, H. R. Dill |
04/08/86 |
67 |
Power Supply Pins and Keying Scheme for VLBA Module Connectors |
A. R. Thompson |
04/08/86 |
68 |
VLBA Electronics Meeting, May 8, 1986 |
D. Thompson |
05/21/86 |
69 |
Cable and Connectors for the Monitor-and-Control Bus |
A. R. Thompson |
05/21/86 |
70 |
Station Timing System |
A. R. Thompson |
05/30/86 |
71 |
VLBA Electronics Meeting, June 5, 1986 |
D. Thompson |
06/06/86 |
72 |
Temperature Coefficients of Gain and Phase for Various Microwave Components |
S. Weinreb, R. Harris |
06/86 |
73 |
Improvement of VLBA/Voyager FET Bias Card |
S. Weinreb |
06/12/86 |
74 |
Breadboard 100 MHz Phase-Shifter for Interferometer Lobe-Rotation |
J. Greenberg |
07/02/86 |
75 |
VLBA Electronics Meeting, July 10, 1986 |
D. Thompson |
07/14/86 |
76 |
Electronics Documentation |
A. R. Thompson |
07/17/86 |
77 |
VLBA Electronics Meeting, August 7, 1986 |
D. Thompson |
08/13/86 |
78 |
Electronics Packaging |
A. R. Thompson |
08/22/86 |
79 |
VLBA Electronics Meeting, September 4, 1986 |
D. Thompson |
09/05/86 |
80 |
VLBA Electronics Meeting, October 2, 1986 |
D. Thompson |
10/06/86 |
81 |
VLBA Electronics Group Meeting, November 6, 1986 |
A. R. Thompson |
11/07/86 |
82 |
Selection of Coaxial Switches |
A. R. Thompson |
11/24/86 |
83 |
VLBA Prototype Electronics Modifications |
A. R. Thompson |
12/02/86 |
84 |
VLBA Electronics Meeting, December 4, 1986 |
A. R. Thompson |
12/05/86 |
85 |
Testing of the VLBA Electronics at the VLA Site |
A. R. Thompson, D. S. Bagri, A. E. E. Rogers |
12/09/86 |
86 |
Design Scheme for Dual-Band Capability at 2 GHz AND 8 GHz Bands |
S. Srikanth |
12/16/86 |
87 |
VLBA Electronics Meeting, January 6, 1987 |
D. Thompson |
01/08/87 |
88 |
VLBA Electronics Meeting, February 3, 1987 |
A. R. Thompson |
02/04/87 |
89 |
CTI Model 22 Test Chronology |
R. Norrod, R. Simon |
02/26/87 |
90 |
Recommendations for the Model 22 Refrigerator |
H. Dill, R. Latasa |
03/02/87 |
91 |
VLBA Electronics Meeting, March 3, 1987 |
A. R. Thompson |
03/11/87 |
92 |
VLBA Electronics Group Meeting/ April 7, 1987 |
A. R. Thompson |
04/07/87 |
93 |
VLBA Electronics Group Meeting, Aug 4, 1987 |
A. R. Thompson |
08/06/87 |
94 |
Notes from VLBA Electronics Meeting, 1987 September 1 |
P. B. Sebring, A. R. Thompson |
09/01/87 |
95 |
VLBA Electronics Division |
A. R. Thompson |
09/16/87 |
96 |
The Frequency Conversion System for the 23 GHz Band |
A. R. Thompson |
09/25/87 |
97 |
VLBA Electronics Meeting, 1987 October 6 |
P. Sebring |
10/06/87 |
98 |
VLBA Electronics Meeting, 1987 November 3 |
P. B. Sebring |
11/03/87 |
99 |
Names and Type Numbers of VLBA Racks and Modules |
A. R. Thompson, H. R. Dill, G. W. Morris |
11/06/87 |
100 |
VLBA Electronics Meeting, January 12, 1988 |
P. B. Sebring |
01/18/88 |
101 |
VLBA Electronics Meeting, February 2, 1988 |
P. B. Sebring |
02/03/88 |
102 |
VLBA Electronics Construction for 1988 |
D. Thompson |
02/12/88 |
103 |
VLBA Electronics Meeting, March 1, 1988 |
D. Thompson |
03/02/88 |
104 |
Modifications To 2-16 GHz Synthesizer Module (L104) |
L. Beale, R. Heald, A. R. Thompson |
03/23/88 |
105 |
VLBA Electronics Meeting, April 5, 1988 |
D. Thompson |
04/07/88 |
106 |
VLBA Electronics Division Meeting, June 2, 1988 |
A. R. Thompson |
06/03/88 |
107 |
VLBI Performance of VLBA Maser at Kitt Peak |
A. E. E. Rogers |
06/06/88 |
108 |
VLBA Electronics Division Meeting, July 7 1988 |
D. Thompson |
07/07/88 |
109 |
New M/C Bus Reset Signal |
E. Schlecht |
09/19/88 |
110 |
VLBA Electronics Division Meeting, November 3, 1988 |
D. Thompson |
11/08/88 |
111 |
VLBA Electronics Meeting, January 17, 1989: Electronics Construction in 1989 |
A. R. Thompson |
01/24/89 |
112 |
Design Considerations for a 43 GHz Receiver |
R. D. Norrod |
02/22/89 |
113 |
Notes on Electronics Meeting 3/2/89 |
E. Schlecht |
03/28/89 |
114 |
VLBA Electronics Memorandum |
L. Beno |
05/11/89 |
115 |
Module Serial Numbers |
A. R. Thompson |
05/26/89 |
116 |
P106 Power Supply Module |
A. R. Thompson |
05/03/90 |
116A |
P106 Power Supply Module |
A. R. Thompson |
07/11/90 |
117 |
VLBA Electronics Construction Plan for 1990-2. |
A. R. Thompson |
05/17/90 |
118 |
Baseband Converter Construction |
A. R. Thompson |
05/31/90 |
119 |
Names, Type Numbers, and Serial Numbers of VLBA Racks and Modules |
A. R. Thompson |
06/08/90 |
120 |
Design and Fabrication of 43 GHz Feed |
S. Srikanth |
01/11/91 |
121 |
Retrofits To VLBA Racks and Modules |
D. Thompson |
11/26/90 |
122 |
VLBA Electronics Construction Plan for 1991-2 |
A. R. Thompson |
01/29/91 |
123 |
The New Azimuth Cable Wrap Arrangement for VLBA Antennas |
D. S. Bagri, J. Ruff |
1991 |
124 |
43 GHz Front-End |
M. F. Masterman |
04/10/91 |
125 |
Baseband Converter Image Rejection Improvements |
L. Beno, B. Willoughby |
11/30/91 |
126 |
Wind Speed Test at Pietown VLBA Antenna |
R. Weimer |
12/91 |
127 |
VLBA Electronics Construction Plan for 1992 |
A. R. Thompson |
01/13/92 |
128 |
Snow Gauge Interfaces To VLBA Weather Station |
R. Weimer |
01/92 |
129 |
VLBA Sampler Test Card |
R. Weimer |
02/92 |
130 |
VLBA Standard Interface Board Retrofit |
R. Weimer |
03/92 |
131 |
B Rack Interface |
R. Weimer |
06/92 |
132 |
VLBA Barometers |
R. Weimer |
06/92 |
133 |
Pulse Cal Injection for 7 mm Band |
D. S. Bagri |
08/14/92 |
134 |
Phase Stability of the Reference 500 MHz in the Station Building |
D. S. Bagri |
08/17/92 |
135 |
RFI at Saint Croix due To FAA RADAR at L-Band |
D. S. Bagri |
11/11/92 |
136 |
Air Conditioning System and Pulsecal Phase Stability |
D. S. Bagri |
03/01/93 |
137 |
Using Pulsecal Amplitudes To Determine System Temperature |
D. S. Bagri |
03/05/93 |
138 |
Base Band Converter - Bandwidth |
E. Henderson |
03/93 |
139 |
VLBA Lightning Damage Reports - 1993 |
P. Rhodes |
09/20/93 |
140 |
Monitoring Power Supplies etc. |
D. S. Bagri |
10/05/93 |
141 |
Contempo HVAC Updgrade |
C. Janes |
01/98 |
142 |
Plan for Corrosion Problems in Electronic Modules at St. Croix |
T. Cotter, P. Harden |
02/11/00 |
143 |
VLBA Site Spectrum Analyzer Requirements |
T. Cotter, R. Armendariz, B. McGoldrick, D. Mertel[e]y |
04/27/01 |
144 |
Location of PT 74 MHz Antenna Eyebolts |
D. Merteley |
07/30/01 |