Memo Number |
Title |
Author(s) |
Date |
Original PDF |
1 |
Memo Series |
A. E. E. Rogers |
11/30/83 |
|
2 |
Proposed Video Convertor Block Diagram |
A. E. E. Rogers |
11/28/83 |
|
3 |
Preliminary Evaluation of Low Noise Voltage Tuned Osoillators |
A. E. E. Rogers |
11/28/83 |
|
4 |
Minutes of Telecon Held 13 Dec 83 at 1430 UT |
- |
01/27/84 |
|
5 |
Minutes of VLBA Recorder/Acquisition Group Help 25 Jan 84 at 1400 EDT |
A. E. E. Rogers |
02/84 |
|
6 |
Minutes of VLBA Recorder/Acquisition Group Held 22 Feb 84 at 1400 EDT |
- |
02/27/84 |
|
7 |
Fringe Rotation and Variable Phase Sampling |
A. E. E. Rogers, J. C. Webber |
02/23/84 |
|
8 |
Rejection of Receiver Images for Various VLBI Processing Techniques |
A. E. E. Rogers |
01/03/84 |
|
9 |
Single Sideband Fringe Rotation - The Effect of the Second Quantization on the Bandpass Filter Function |
A. E. E. Rogers |
02/29/84 |
|
10 |
Minutes of VLBA Data Acquisition Held 28 March 1984 at 1300 EST |
- |
04/02/84 |
|
11 |
Glossary of Recording Jargon |
L. R. D'Addario |
02/20/84 |
|
12 |
Data Transmission Error Specification |
L. R. D'Addario |
02/26/84 |
|
13 |
Sony High-Density Digital Recorder |
A. E. E. Rogers |
04/18/84 |
|
14 |
Closure Errors from Bandpass Offsets |
A. E. E. Rogers |
04/25/84 |
|
15 |
Minutes of Acquisition/Recorder Telecon Held 25 April 1984 at 1300 EST |
- |
04/26/84 |
|
16 |
Visit To Kodak Datatape |
A. E. E. Rogers, R. J. Cappallo |
05/07/84 |
|
17 |
Minutes of VLBA Recorder Acquisition Group Telecon Held on 23 May 1984 at 1400 EDT |
- |
05/25/84 |
|
18 |
Minutes of VLBA Recorder Acquisition Group Telecon Held on 23 May 1984 at 1400 EDT |
A. E. E. Rogers |
07/02/84 |
|
19 |
Suggested DPS/Correlator Interface |
A. R. Whitney, A. E. E. Rogers, J. C. Webber |
07/28/84 |
|
20 |
Update on Suggested DPS/Correlator Interface |
Haystack Group |
08/24/84 |
|
21 |
Automatic Video Cassette Changer |
W. T. Petrachenko |
09/10/84 |
|
22 |
Minutes of VLBA Recorder Group Held 12 September 1984 at 1600 EDT |
- |
09/13/84 |
|
23 |
Is Phase Switching Needed? |
A. E. E. Rogers |
09/17/84 |
|
24 |
Playback To Correlator Interface: Early Ideas |
L. R. D'Addario |
09/18/84 |
|
25 |
Improving the Dynamic Range of the I.F. To Video Converters |
A. E. E. Rogers |
10/02/84 |
|
26 |
Error Correction for VLBI |
S. Wilson |
10/05/84 |
|
27 |
Tape Synchronization at VLBA Correlator |
A. R. Whitney |
10/29/84 |
|
28 |
Proposed Recorder Specifications - Revised 11 September 1984 |
A. E. E. Rogers, J. C. Webber, H. F. Hinteregger |
09/11/84 |
|
29 |
Comments on "Tape Synchronization", Acq Memo #27 |
L. R. D'Addario |
11/13/84 |
|
30 |
Diminishing Returns |
H. F. Hinteregger |
11/29/84 |
|
31 |
Minutes of VLBA Data Acquisition/Recorder Group Telecon Held on 12 December 1984 at 1600 EST |
- |
12/13/84 |
|
32 |
Minutes of VLBA Recorder/Acquisition Group Telecon Held 9 January 1985 at 1600 EST |
- |
01/10/85 |
|
33 |
Is Efficient Encoding of 3-Level Data Worth the Extra Cost and Complexity? |
A. E. E. Rogers, J. C. Webber |
01/16/85 |
|
34 |
Upper Limit on the "DC" Correlation Present in the Mark III |
A. E. E. Rogers |
02/04/85 |
|
35 |
Reasons for Not Separating the Formatter from the IF To Baseband Conversion Electronics |
A. E. E. Rogers |
02/20/85 |
|
36 |
Minutes of VLBA Acquisition/Recorder Group Meeting Held 13 March 1985 at 1600 EST |
A. E. E. Rogers |
03/14/85 |
|
37 |
Some Suggestions on RF-Pulse Phase and Delay Calibration |
A. E. E. Rogers |
04/03/85 |
|
38 |
Minutes of VLBA Recorder/Acquisition Group Telecon Held 10 April 1985 at 1600 EST |
A. E. E. Rogers |
04/16/85 |
|
39 |
The DPS / Correlator Control Interface |
J. D. Romney |
04/85 |
|
40 |
Preliminary VLBA Format Proposal #1 |
W. T. Petrachenko |
04/85 |
|
41 |
Across Track Parity |
W. T. Petrachenko |
05/85 |
|
42 |
VLBA Data Acquisition and Playback Systems Design and Cost Estimate |
- |
05/85 |
|
43 |
Minutes of VLBA Recorder/Acquisition Group Telecon Held 8 May 1985 at 1600 EDT |
A. E. E. Rogers |
05/10/85 |
|
44 |
Minutes of VLBA Data Acquisition Group Telecon Held 19 June 1985 at 1600 EDT |
A. E. E. Rogers |
06/21/85 |
|
45 |
Minutes of the VLBA Data Acquisition Group Telecon Held 17 July 1985 at 1600EDT |
A. E. E. Rogers |
07/29/85 |
|
46 |
IF Processing Electronics - Preliminary Design |
A. E. E. Rogers |
07/31/85 |
|
47 |
Active Low Pass Filter for Baseband Converters |
A. E. E. Rogers |
08/05/85 |
|
48 |
Suggested VLBA Bandpass |
A. E. E. Rogers |
08/07/85 |
|
49 |
Minutes of Data Acquisition/Recorder Group Telecon Held 14 August 1985 at 1600 EDT |
A. E. E. Rogers |
08/16/85 |
|
50 |
VLBA Bandpass and Closure Phase Errors |
A. E. E. Rogers |
08/21/85 |
|
51 |
Extending the Baseband Bandwidth of the Baseband Converter To 16 MHz |
A. E. E. Rogers |
09/03/85 |
|
52 |
Cost of Increased Data Rates in Acquisition and Playback |
A. E. E. Rogers |
09/04/85 |
|
53 |
Suggested Interfaces To the Data Acquisition System (DAS) |
A. E. E. Rogers |
09/17/85 |
|
54 |
Minutes of Data Acquisition and Playback Group Telecon Held at 1600 EDT, 18 September 1985 |
A. E. E. Rogers |
09/19/85 |
|
55 |
Proposed Use of Miniature Coaxicon Contacts |
A. E. E. Rogers |
10/07/85 |
|
56 |
Minutes of VLBA Data Acquistion/Recorder Group Telecon Held 23 October 1985 at 1300 EDT |
A. E. E. Rogers |
11/85 |
|
57 |
Minutes of Recorder/Acquisition Group Telecon Held 13 Noventoer 1985 at 1600 EST |
A. E. E. Rogers |
11/18/85 |
|
58 |
Susceptibility of VLBA Data Acquisition System To Interference in the I.F. (500-1000 MHz) Band |
A. E. E. Rogers |
11/18/85 |
|
59 |
Minutes of the Acquisition/Recorder Group Telecon Held 11 December 1985 at 1600 EST |
A. E. E. Rogers |
12/13/85 |
|
60 |
Minutes of the Recorder/Data Acquisition Telecon Held 22 January 1986 at 1300 EST |
A. E. E. Rogers |
01/23/86 |
|
61 |
Preliminary Tests of Prototype VLBA Baseband Converter |
A. E. E. Rogers |
03/04/86 |
|
62 |
Minutes of VIBA Data Acquisition/Recorder Group Meeting Held 19 March 1986 at 1300 EST |
A. E. E. Rogers |
03/20/86 |
|
63 |
Proposed Use of Coaxicon Connectors in VLBA Modules |
A. E. E. Rogers, R. J. Cady |
03/28/86 |
|
64 |
VLBA Baseband Converter Tests- Status of Performance Verification |
A. E. E. Rogers |
04/29/86 |
|
65 |
MCB Protocol for Baseband Converter and I.F. Distributor |
A. E. E. Rogers |
05/07/86 |
|
66 |
Minutes of the VLBA Recorder/Data Acquisition Telecon Held 9 July 1986 at 1300 EDT |
A. E. E. Rogers |
07/10/86 |
|
67 |
Stability Test of VLBA Data Acquisition Electronics |
A. E. E. Rogers, K. Ball |
07/16/86 |
|
68 |
Minutes of the VLBA Data Acquisition and Playback Group Telecon Held 10 September 1986 at 1300 EST |
A. E. E. Rogers |
09/11/86 |
|
69 |
Active Filter — Sensitivity To Operational Amplifier Performance |
A. E. E. Rogers |
09/19/86 |
|
70 |
Baseband Converter Local Oscillator Phase Noise Tests with Various Transistor Types |
A. E. E. Rogers |
09/29/86 |
|
71 |
VLBA Acquisition Recorder Controller Communications Protocol |
R. Cappallo |
10/16/86 |
|
72 |
Baseband Converter MCB Protocol Errata |
A. E. E. Rogers |
11/05/86 |
|
73 |
Minutes of VLBA Data Acquisition/Recording Telecon Held 1300 EDT on 5 November 1986 |
A. E. E. Rogers |
11/07/86 |
|
74 |
Improved 16 MHz Bandpass and Further Tests of the Bandpass Stability |
A. E. E. Rogers |
11/13/86 |
|
75 |
VLBA Baseband Converter Tests - Status of Performance Verification II |
A. E. E. Rogers |
11/13/86 |
|
76 |
Radio Shack TRS-80 Model 100 Portable Conputer for Check-out of VLBA Hardware Requiring MCB Communications |
A. E. E. Rogers |
01/15/87 |
|
77 |
Checks and Diagnostics of I.F. Processing Electronics |
A. E. E. Rogers |
01/26/87 |
|
78 |
Revisions To Signal Levels in VLBA Receiving System |
A. E. E. Rogers, D. Bagri |
01/26/87 |
|
79 |
4-Level Sampling and Baseband Conversion AGC |
A. E. E. Rogers |
01/26/87 |
|
80 |
I.F. Distributor and Baseband Convert Evaluation and Modifications |
A. E. E. Rogers |
02/09/87 |
|
81 |
Tape for the VLBA |
J. C. Webber, H. F. Hinteregger |
02/25/87 |
|
82 |
Changes To MCB Protocol for Baseband Converter and I.F. Distributor |
A. E. E. Rogers |
03/13/87 |
|
83 |
Minutes ot the Data Acquisition/Recording Group Telecon Held 11 March 1987 at 1300 EST |
A. E. E. Rogers |
03/13/87 |
|
84 |
Digital Gain Control - Improved Phase Performance |
A. E. E. Rogers |
03/11/87 |
|
85 |
Tests of Switched Power or "Synchronous” Detectors in the I.F. Distributors and Baseband Converters |
A. E. E. Rogers |
04/03/87 |
|
86 |
Adjustments Which May Be Required in the Checkout of the VLBA Baseband Converters |
A. E. E. Rogers |
04/30/87 |
|
87 |
Minutes of VLBA Recorder Group Telecon Held 6 May 1987 at 1300 EDT |
A. E. E. Rogers |
05/07/87 |
|
88 |
The Effect of Bias Current Fluctuations on the Phase Noise of a FET Oscillator |
A. E. E. Rogers |
06/11/87 |
|
89 |
Proposed New Rack Layout for DAR |
A. E. E. Rogers |
07/09/87 |
|
90 |
Minutes of VLBA Data Recording Telecon Held 1300 EDT on 8 July 1987 |
A. E. E. Rogers |
07/09/87 |
|
91 |
Proposed VLBA Format |
A. E. E. Rogers |
08/87 |
|
92 |
Sony Visit / D1 Tape for VLBA / MP Tape, MIG Heads? |
H. F. Hinteregger |
04/10/87 |
|
93 |
Minutes of the VLBA Recorder/Data Acquisiton Telecon Held 9 September 1987 at 1300 EDT |
A. E. E. Rogers |
09/10/87 |
|
94 |
Tape Packaging |
H. F. Hinteregger |
09/14/87 |
|
95 |
REC #1 Acceptance Tests |
J. C. Webber |
10/26/87 |
|
96 |
Minutes of the VLBA Recorder/Data Acquisiton Telecon Held 4 November 1987 at 1300 EST |
A. E. E. Rogers |
11/09/87 |
|
97 |
MKIIIA - VLBA Compatibility Mode |
A. E. E. Rogers, J. C. Webber |
11/09/87 |
|
98 |
Operating the VLBA Recorder |
J. C. Webber |
11/12/87 |
|
99 |
VLBA Tape Drive Control |
J. C. Webber |
11/12/87 |
|
100 |
Dense Prognostications |
H. F. Hinteregger |
11/25/87 |
|
101 |
VLBA Baseband Converter Bandpass |
A. E. E. Rogers |
12/23/87 |
|
102 |
Data Acquisition Modes |
A. E. E. Rogers, J. C. Webber |
12/30/87 |
|
103 |
Minutes of the Data Acquisition/Recorder Telecon Held 13 Jan 88 |
A. E. E. Rogers |
01/14/88 |
|
104 |
Data Acquisition Modes - Revision of Memo #102 |
A. E. E. Rogers, J. C. Webber |
01/14/88 |
|
105 |
Approximate Cost Comparison for 1 vs 2 DAR Racks/Site |
A. E. E. Rogers |
01/19/88 |
|
106 |
Minutes of the Data Acquisition/Recorder Group Telecon Held 9 March 1988 at 1300 EST |
A. E. E. Rogers |
03/10/88 |
|
107 |
Learning from Errors |
H. F. Hinteregger |
01/21/88 |
|
108 |
Phase Calibration Detection and Processing at the Sites |
A. E. E. Rogers, E. F. Nesman |
03/05/88 |
|
109 |
Minutes of VLBA Recorder Group Telecon Held 11 May 1988 |
A. E. E. Rogers |
05/12/88 |
|
110 |
Tape Track Formats |
J. C. Webber |
05/27/88 |
|
111 |
New Bandwidth Compensation Gain Codes for Baseband Converters |
A. E. E. Rogers |
07/05/88 |
|
112 |
Minutes of VLBA Recorder/Data Acquisition Group Telecon Held 13 July 1988 at 1300 EDT |
A. E. E. Rogers |
07/14/88 |
|
113 |
Minutes of VLBA Recorder Group Telecon Held 14 September 1988 at 1300 EDT |
A. E. E. Rogers |
09/15/88 |
|
114 |
Requirements To Make VLBA DAR and REC Fully Compatible With Geodetic S/X Mode |
A. E. E. Rogers |
10/14/88 |
|
115 |
Minutes of VLBA Acquisition/Recorder Group Telecon Held 9 November 1988 at 1300 EDT |
A. E. E. Rogers |
11/11/88 |
|
116 |
Coaxicon Connector Alignment |
A. E. E. Rogers |
11/22/88 |
|
117 |
MKIIIA/VLBA Compatibility-An Update |
A. E. E. Rogers |
11/29/88 |
|
118 |
Recording Characterization Test Plan |
A. E. E. Rogers |
12/09/88 |
|
119 |
Narrow Guardband Test of VLBA Tape Recorder |
G. Peck |
12/20/88 |
|
120 |
Computers, Software, and Procedures for Check-Out of DAR Modules |
A. E. E. Rogers |
01/19/89 |
|
121 |
Tracking Offset Sensitivity To Capstan Axis Alignment |
A. E. E. Rogers |
02/24/89 |
|
122 |
Tracking Offset Sensitivity To Capstan Taper Angle |
A. E. E. Rogers |
02/24/89 |
|
123 |
First Order Model for Recorder Tracking |
A. E. E. Rogers |
02/24/89 |
|
124 |
Theory of Vacuum Loop and Tape Path |
A. E. E. Rogers |
02/24/89 |
|
125 |
Minutes of Recorder Group Telecon Held 9 February 1989 at 1300 EST |
A. E. E. Rogers |
02/09/89 |
|
126 |
Variation of the Tracking Sensitivity with the Angle the Tape Makes with the Precision Plate |
A. E. E. Rogers |
02/24/89 |
|
127 |
Modification of Mark 3A Systems To Increase Compatibility With VLBA |
A. R. Thompson |
01/31/89 |
|
128 |
Pulse Calibration Detection in VLBA |
A. R. Thompson |
02/08/89 |
|
129 |
Model for the Tracking Offset Dependence on Tape Defects |
A. E. E. Rogers, G. Peck |
04/13/89 |
|
130 |
Visit To Honeywell Corporation |
A. E. E. Rogers |
03/08/89 |
|
131 |
Friction at the Tape Entry and Exit Points |
A. E. E. Rogers |
03/13/89 |
|
132 |
Various Operating Modes of the Model 96 and Their Sensitivity To Machine Alignment and Tape Defects |
A. E. E. Rogers |
03/13/89 |
|
133 |
Measurement of the Thermal and Elastic Constants of Magnetic Tape |
A. E. E. Rogers |
03/30/89 |
|
134 |
Tape Reel Pack - Computer Simulations |
A. E. E. Rogers |
04/03/89 |
|
135 |
Tape Slitting Signatures and Head-to-Tape Tension Noise from Slitting Errors |
A. E. E. Rogers |
04/05/89 |
|
136 |
Tracking Offset Sensitivity To Idler Tilt and Taper Angle |
A. E. E. Rogers |
04/10/89 |
|
137 |
Draft Recommendations for Improvement To Model 96 Mechanical Performance |
A. E. E. Rogers |
04/12/89 |
|
138 |
Idler Bearing Friction |
A. E. E. Rogers |
04/12/89 |
|
139 |
Minutes of VLBA Data Recording Telecon Held 12 April 1989 at 1300 EDT |
A. E. E. Rogers |
04/13/89 |
|
140 |
Some Order of Magnitude Calculations of the Air Entrapment at the Idler |
A. E. E. Rogers |
04/18/89 |
|
141 |
Head To Tape Contact Profiles: Computation of Inter-Changeability of Various Tapes |
A. E. E. Rogers |
04/18/89 |
|
142 |
Tape Strain: Determination of the Best Tape Tension for Thin Tape |
A. E. E. Rogers |
04/24/89 |
|
143 |
Summary of What We Have Learned During Recorder Mechanical Study |
A. E. E. Rogers |
05/01/89 |
|
144 |
Some Tests of the Effect of Idler Groove Cross Section |
A. E. E. Rogers |
05/01/89 |
|
145 |
Improved Performance with AT&T Bit Synchronizer |
D. Smythe, E. Nesman, R. Cappallo |
05/04/89 |
|
146 |
Head To Tape Contact at 270 IPS |
A. E. E. Rogers |
05/05/89 |
|
147 |
Measured Head Profiles |
A. E. E. Rogers |
05/16/89 |
|
148 |
Some Added Notes To the BBC 0.5-1.0 GHz Oscillator |
A. E. E. Rogers |
05/16/89 |
|
149 |
Model for Recorder Tracking Response To Tape Slitting Signatures |
A. E. E. Rogers |
05/18/89 |
|
150 |
Draft Specifications for VLBA Tape and a Very Brief Look at Some Newer Tapes |
A. E. E. Rogers |
05/23/89 |
|
151 |
Recorder "Pretest" - Methods for Checking Recorder Performance |
A. E. E. Rogers, R. J. Cappallo, H. F. Hinteregger, D. L. Smythe, A. R. Whitney |
06/20/89 |
|
152 |
Magnetic Circuit Model for VLBA Headstack |
A. E. E. Rogers |
06/05/89 |
|
153 |
Recommendations for DAR Protection Measures |
A. E. E. Rogers |
03/31/89 |
|
154 |
MKIIIA/VLBA Narrow Track Headstack Commercial Specifications |
J. F. Connolly, H. F. Hinteregger, D. L. Smythe |
04/09/91 |
|
155 |
Measurement of Mutual Inductance of VLBA Headstack |
A. E. E. Rogers |
07/06/89 |
|
156 |
Tests of New Large Diameter Idler Roller |
A. E. E. Rogers |
07/10/89 |
|
157 |
Tests of D1 and D2 Tapes |
B. Lai, A. E. E. Rogers |
07/20/89 |
|
158 |
Playback of Pie Town data at the MKIII Correlator - Corrected Version |
A. E. E. Rogers |
08/22/89 |
|
159 |
Minutes of the VLBA Recorder Telecon Held 9 August 1989 at 1300 EDT |
A. E. E. Rogers |
08/10/89 |
|
160 |
Do We Need a Prepass? |
G. Peck |
08/14/89 |
|
161 |
Summary of VLBA Recorder Review Meeting |
A. E. E. Rogers, K. Stetten |
08/17/89 |
|
162 |
Improvements in SSB Mixer Submodule of BBC |
A. E. E. Rogers |
08/24/89 |
|
163 |
Plan for More Complete Testing of 13µm D-1 Tape |
A. E. E. Rogers |
08/28/89 |
|
164 |
Dynamic Range of IFD Square Law Detector Bias Subtraction |
A. E. E. Rogers |
08/30/89 |
|
165 |
Some Miscellaneous Problems Noted in the BBC Modules |
A. E. E. Rogers |
08/30/89 |
|
166 |
Minutes of Ad Hoc Meeting Concerning Thin Tape for VLBA |
G. Peck |
08/24/89 |
|
167 |
IF and Sampler Connections in the 14-Baseband-Converter DAR Configuration |
A. R. Thompson |
08/22/89 |
|
168 |
More Computer Simulations on Head Wear and Transition from Thick To Thin Tape |
A. E. E. Rogers |
09/10/89 |
|
169 |
Optimization of Equalizer for Playback of D1 Tapes at 56 Kb/in |
A. E. E. Rogers |
09/14/89 |
|
170 |
Measurements of Head Wear Rates - Preliminary Results |
A. E. E. Rogers |
09/19/89 |
|
171 |
Power Margin Tests of REC 3 |
A. E. E. Rogers, R. J. Cappallo |
09/27/89 |
|
172 |
Some Quick Tests of S-VHS Tape |
A. E. E. Rogers |
10/02/89 |
|
173 |
Minutes of Recorder Telecon Held 11 October 1989 at 1300 EDT |
A. E. E. Rogers |
10/13/89 |
|
174 |
Suggestions for BBC Production |
A. E. E. Rogers |
10/16/89 |
|
175 |
Performance of 3M5358 Relative To Sony D1K |
A. E. E. Rogers |
10/17/89 |
|
176 |
Bandpass Simulations for BBC |
A. E. E. Rogers |
10/23/89 |
|
177 |
Notes on Meeting on Baseband Converters |
A. R. Thompson |
10/18/89 |
|
178 |
Circuit Board Changes in DAR |
J. C. Webber, R. R. Grenwis |
10/23/89 |
|
179 |
Head To Tape Contact Pressure |
A. E. E. Rogers |
11/02/89 |
|
180 |
Simple Optical Interferometer for Viewing Tape Surface Roughness |
A. E. E. Rogers |
11/02/89 |
|
181 |
Method of Measuring Differential Tension in the Tape Path |
A. E. E. Rogers |
11/20/89 |
|
182 |
Dual Sampler for Mark III Mode A Compatibility |
J. C. Webber |
12/14/89 |
|
183 |
Test Fixture for Matching Mixers in the SSB Submodule of the BBC |
A. E. E. Rogers |
12/21/89 |
|
184 |
Wavelength Dependence of D1 and MET - VLBA "Headcurves" |
A. E. E. Rogers |
12/27/89 |
|
185 |
Tests of Emitter Follower Head Pre-Amplifier |
A. E. E. Rogers |
12/27/89 |
|
186 |
Tests of a New Pre-Amp Configuration |
A. E. E. Rogers |
12/29/89 |
|
187 |
Tape Noise Measurements of D1K and S-VHS |
A. E. E. Rogers |
01/09/90 |
|
188 |
Channel Assignments for the Various DAR Configurations |
G. Peck |
01/09/90 |
|
189 |
NRAO Thin Tape Procurement |
G. Peck |
01/17/90 |
|
190 |
A Quick Test of 8 mm Evaporated Metal Tape (MET) |
A. E. E. Rogers |
01/30/90 |
|
191 |
"In-circuit" Component Measurements for BBCs |
A. E. E. Rogers |
01/31/90 |
|
192 |
Playback Transport Configuration |
A. E. E. Rogers |
02/01/90 |
|
193 |
Identification Codes for 14-BBC DAR |
A. R. Thompson |
01/26/90 |
|
194 |
Summary of What We Learned in Testing Tape Performance |
A. E. E. Rogers |
02/02/90 |
|
195 |
Tests of Parallel Playback Electronics |
A. E. E. Rogers |
02/02/90 |
|
196 |
Demonstration of Gigabit per Second Recording with the VLBA Recorder |
A. E. E. Rogers |
02/07/90 |
|
197 |
Minutes of VLBA Telecon Held 14 February 1990 |
A. E. E. Rogers |
02/15/90 |
|
198 |
Matched Mixer Pairs for SSB Mixers |
J. C. Webber, D. L. Thacker |
02/07/90 |
|
199 |
Checkout of Baseband Converters |
A. E. E. Rogers |
02/26/90 |
|
200 |
Parameterized Spacing Loss Curves for Transition from Thick To Thin Tape |
A. E. E. Rogers |
03/12/90 |
|
201 |
Simple Test Set-up for BBC LO Phase Noise Tests |
A. E. E. Rogers |
03/28/90 |
|
202 |
Proposed Plan for the Integration of Thin Tapes into the MKIIIA and VLBA Operations |
A. E. E. Rogers |
04/26/90 |
|
203 |
Instructions for Using Baseband Converter Test Program |
E. Schlecht |
04/30/90 |
|
204 |
Minutes of Recorder Meeting Held 2 May 1990 at 1300 EDT |
A. E. E. Rogers |
05/03/90 |
|
205 |
Proposal for a Cost-Effective Doubling of Existing VLBI Sensitivity |
Haystack Observatory VLBI Group |
05/18/90 |
|
206 |
Minutes of VLBA Recorder Telecon Held 13 June 1990 at 1300 EDT |
A. E. E. Rogers |
06/14/90 |
|
207 |
Measurements of Record Spacing Loss and a Simple Numerical Model To Evaluate the Effect of Demagnetization Fields |
A. E. E. Rogers, S. Deligeorges |
06/27/90 |
|
208 |
Tests of a Method To Support Thick and Thin Tape on a Processor Transport |
A. E. E. Rogers |
06/27/90 |
|
209 |
BBC LO Phase Stabilization Time |
D. Bagri, A. E. E. Rogers |
07/09/90 |
|
210 |
Tests of VLBA Read/Write Interface |
A. E. E. Rogers, H. F. Hinteregger |
07/16/90 |
|
211 |
Record Cross-talk Theory |
A. E. E. Rogers, D. L. Smythe |
07/17/90 |
|
212 |
Minutes of VLBA Recorder Telecon Held 8 August 1990 at 1300 EDT |
A. E. E. Rogers |
08/09/90 |
|
213 |
Performance Specifications of the Baseband Converter Module |
A. R. Thompson |
08/10/90 |
|
214 |
Some Tests of the TI TL592B Amplifier |
A. E. E. Rogers |
08/13/90 |
|
215 |
Use of Unequal Wire Sizes To Match Mixers in BBC |
A. E. E. Rogers |
08/21/90 |
|
216 |
Alternate IC for L.O. Unlock Indicator in BBC |
A. E. E. Rogers |
08/22/90 |
|
217 |
Proposal for Design Change To Reduce L.O. Leakage from BBC |
A. E. E. Rogers |
08/23/90 |
|
218 |
The Effect of DC Offsets on the Complex Correlation Amplitudes |
A. E. E. Rogers |
08/23/90 |
|
219 |
Spurious Signals in the BBC |
A. E. E. Rogers |
08/31/90 |
|
220 |
Dummy Headstack Post for Improved Tracking Symmetry |
A. E. E. Rogers, H. F. Hinteregger, P. Bolis |
09/06/90 |
|
221 |
Replacement for MA-46577B Varactor in BBC Oscillator |
A. E. E. Rogers |
09/10/90 |
|
222 |
Changes Needed in BBC Using Analog Devices 5539 |
A. E. E. Rogers |
10/16/90 |
|
223 |
Spurious Signal Levels in DAR and Proposed Changes |
A. E. E. Rogers |
09/27/90 |
|
224 |
"Self" Tests of DAR and REC |
A. E. E. Rogers |
10/02/90 |
|
225 |
Preliminary Report on First VLBA Tape |
A. E. E. Rogers, H. F. Hinteregger, D. L. Smythe, P. Bolis |
10/04/90 |
|
226 |
Thin Tape Facts |
H. Hinteregger |
10/19/90 |
|
227 |
Alternative Mixers for Better Sideband Rejection in the BBC |
A. E. E. Rogers |
10/25/90 |
|
228 |
Tape Winding and Tape Thickness Non-uniformity |
A. E. E. Rogers |
11/30/90 |
|
229 |
Update on the AMPEX/Maxell Tape Packing Problem |
A. E. E. Rogers |
12/04/90 |
|
230 |
Reduced L.O. Leakage from the BBC |
A. E. E. Rogers |
12/12/90 |
|
231 |
Minutes of the VLBA Recorder Telecon Held 12 December 1990 at 1300 EST |
A. E. E. Rogers |
12/13/90 |
|
232 |
Edge Slitting Signatures and Edge Quality of 16 µm Tapes |
A. E. E. Rogers, H. F. Hinteregger |
12/31/90 |
|
233 |
Dynamic Forces on the Tape Edge |
A. E. E. Rogers |
12/31/90 |
|
234 |
Measurement of D.C. Offsets from Sampler |
A. E. E. Rogers |
01/07/91 |
|
235 |
Limitations of the Track Selector Switch in the VLBA Formatter |
A. E. E. Rogers, J. I. Levine |
01/07/91 |
|
236 |
Tape Elastic Constant Check via Tape Winding |
A. E. E. Rogers, H. F. Hinteregger, P. Hinteregger |
01/19/91 |
|
237 |
Methods of Measuring the Headstack Gap Length |
A. E. E. Rogers, H. F. Hinteregger |
01/18/91 |
|
238 |
Recorder Controller Commands (ReCon v. 6.0) |
R. Cappallo |
05/22/92 |
|
239 |
Version 5 of RECON |
R. Cappallo |
01/25/91 |
|
240 |
Meeting on Problems of Analog Crosspoint Switch on A/D Board of Formatter |
D. Thompson |
01/24/91 |
|
241 |
Revised Model for VLBA Head Efficiency |
A. E. E. Rogers |
01/31/91 |
|
242 |
Penny & Giles VLBI Recorder Project Design Review - Trip Report |
D. Smythe |
01/31/91 |
|
243 |
Capacitance of Gapped Bars |
D. Smythe |
02/14/91 |
|
244 |
Minutes of Recorder Group Meeting Telecon Held 13 February 1991 at 1300 EDT |
A. E. E. Rogers |
02/14/91 |
|
245 |
Efficiency Variations in VLBA Headstacks |
A. E. E. Rogers |
02/25/91 |
|
246 |
Scanning Electron Microscope (SEM) Gap Length Measurement |
H. F. Hinteregger |
02/27/91 |
|
247 |
Mark III Tape-Labelling and Handling Procedures |
A. R. Whitney |
03/20/91 |
|
248 |
Proposed Phase Cal Extractor for Upgraded Formatter A/D Board |
A. E. E. Rogers |
03/28/91 |
|
249 |
Proposed Redesign of Formatter A/D Buffer Module |
A. E. E. Rogers, E. F. Nesman |
04/01/91 |
|
250 |
VLBA Tape Recorder and Formatter Status/Error Monitor Points |
G. Peck |
03/27/91 |
|
251 |
Minutes of VLBA Data Acquisition/Recording Telecon Held 17 April 1991 at 1300 EDT |
A. E. E. Rogers |
04/18/91 |
|
252 |
How Head SNR Affects Reproduce Performance |
D. Smythe |
05/17/91 |
|
253 |
12 Hours/Tape at 128 Mb/s |
A. E. E. Rogers |
05/21/91 |
|
254 |
Calculations Concerning Air Entrapment at the Headstack and the Maintenance of Good Head-to-tape Contact |
A. E. E. Rogers |
06/12/91 |
|
255 |
Specifications for VLBA Phase Calibration Pulse Generator |
A. E. E. Rogers |
05/25/91 |
|
256 |
Tape Profile Along the Headstack |
A. E. E. Rogers |
06/10/91 |
|
257 |
Dynamic Friction and Viscous Drag in the Vacuum Columns |
A. E. E. Rogers |
06/17/91 |
|
258 |
Write Drier Asymmetry Improvements |
V. A. Tran, A. E. E. Rogers |
07/11/91 |
|
259 |
Head To Tape Contact at 320 IPS with Thin Tape |
D. Smythe |
06/17/91 |
|
260 |
Performance of Mark IIIA Recorder at 56 kbpi and 18 Mb/s |
D. Smythe |
06/91 |
|
261 |
Minutes of Recorder Telecon Held 19 June 1991 at 1300 EST |
A. E. E. Rogers |
06/20/91 |
|
262 |
Vacuum Column Air Bearing Clearance |
A. E. E. Rogers |
06/27/91 |
|
263 |
Tape Winding Dynamics |
A. E. E. Rogers |
07/08/91 |
|
264 |
Theoretical Model for Head Flying |
A. E. E. Rogers |
07/26/91 |
|
265 |
Simple Method of Measuring the Edge Curl |
A. E. E. Rogers |
07/10/91 |
|
266 |
Thermal Calculations for High Tape Speeds |
A. E. E. Rogers |
07/15/91 |
|
267 |
Tape (Thin) and Transport Handling Proc |
A. E. E. Rogers |
09/27/91 |
|
268 |
Slipping Capstans |
A. E. E. Rogers |
07/15/91 |
|
269 |
Accelerated Tape Wear Tests |
A. E. E. Rogers |
07/17/91 |
|
270 |
VLBA Write Driver at 18 Mb/s |
D. Smythe |
07/12/91 |
|
271 |
Method of Contouring Heads for High Tape Speeds |
A. E. E. Rogers |
07/31/91 |
|
272 |
Spacing Loss from Uneven Wear of Headstacks |
A. E. E. Rogers, H. F. Hinteregger |
08/02/91 |
|
273 |
Magnetic Tape "Flying" Measurements vs. Model |
J. Starr, A. E. E. Rogers |
08/23/91 |
|
274 |
Preliminary Tests of Various Low Friction Surfaces |
A. E. E. Rogers |
08/08/91 |
|
275 |
Minutes of Recorder Telecon Held 7 August 1991 at 1300 EST |
A. E. E. Rogers |
08/08/91 |
|
276 |
Quality Control Checks for Inch-Worm Drives |
D. Smythe |
08/21/91 |
|
277 |
Modifying the VLBA Head Interface for Recording at 18 Mb/s |
D. Smythe |
08/22/91 |
|
278 |
Missing Ground In Read Module |
K.M. Wilson |
08/12/91 |
|
279 |
Reel Alignment Tolerance |
A. E. E. Rogers |
10/21/91 |
|
280 |
Reels for Thin Tape |
H. F. Hinteregger |
10/23/91 |
|
281 |
Possible Variations on Vacuum Loop |
A. E. E. Rogers |
08/30/91 |
|
282 |
Additions To Head Flying Model and Comparison with Measurements |
A. E. E. Rogers |
09/17/91 |
|
283 |
Preliminary Tests of New and Experimental Headstacks |
A. E. E. Rogers |
09/25/91 |
|
284 |
Tests of Prototype Phase Calibration Pulse Generator |
A. E. E. Rogers |
10/07/91 |
|
285 |
Write Driver Improvements |
D. Smythe |
10/04/91 |
|
286 |
Head Wear Rates with Fotoceram Spacers |
A. E. E. Rogers |
10/21/91 |
|
287 |
Recorder Telecon Held 9 October 1991 at 1300 EST |
A. E. E. Rogers |
10/10/91 |
|
288 |
Progress Report on the Solution To the Tape Edge Heating Problem |
A. E. E. Rogers, H. F. Hinteregger |
10/22/91 |
|
289 |
Recorder Test Procedures |
G. Peck, A. E. E. Rogers |
09/13/91 |
|
290 |
Configuration of Tape Path for Thin Tape and High Speed |
H. F. Hinteregger, A. E. E. Rogers |
02/12/92 |
|
291 |
Bar-Code Reader on VLBA Transport |
A. R. Whitney |
11/29/91 |
|
292 |
Minutes of Recorder Group Telecon Held 11 December 1991 at 1300 EDT |
A. E. E. Rogers |
12/12/91 |
|
293 |
The Effect of the Reel Hub on Tape Pack |
A. E. E. Rogers, H. F. Hinteregger |
12/18/91 |
|
294 |
Septum Interference with Precision Plate |
K. M. Wilson |
02/05/92 |
|
295 |
Minutes of Recorder Group Telecon Held 12 February 1992 at 1300 EDT |
A. E. E. Rogers |
02/13/92 |
|
296 |
Summary of Results of Thin Tape Inspections |
A. Sandler, H. F. Hinteregger, A. E. E. Rogers, N. Donald, D. Sousa |
02/19/92 |
|
297 |
Tests of Phase Calibration Pulse Generator from 22-43 GHz |
A. E. E. Rogers |
02/20/92 |
|
298 |
Plan for Accelerated Testing of Thin Tape |
A. E. E. Rogers |
02/27/92 |
|
299 |
DRAFT - Tape Procurement Specification |
A. E. E. Rogers, H. F. Hinteregger |
05/19/92 |
|
300 |
Measured Tolerance on Reel Table Alignment |
A. E. E. Rogers, H. F. Hinteregger |
03/05/92 |
|
301 |
Mechanical Upgrade Steps |
A. E. E. Rogers, K. M. Wilson, H. F. Hinteregger |
03/06/92 |
|
302 |
Mechanical Model for Reel Table Alignment Needed for Low Speed Running |
A. E. E. Rogers |
03/12/92 |
|
303 |
Head Assembly Mounting Screws Bottoming out on the High Performance Damper |
D. Fields |
03/10/92 |
|
304 |
Minutes of Recorder Telecon held 8 April 1992 at 1300 EDT |
A. E. E. Rogers |
04/09/92 |
|
305 |
Head Flying: Expected Changes with Head Wear |
A. E. E. Rogers |
04/30/92 |
|
306 |
Differences in the VLBA, MkIII and MkIV IF To Baseband Conversion |
A. E. E. Rogers |
05/04/92 |
|
308 |
Tape Edge Abrasion by Contact with Reel Flange Rims |
A. E. E. Rogers, H. F. Hinteregger |
06/22/92 |
|
309 |
Possible Replacements for the 10G070 Dual Modulus Counter |
A. E. E. Rogers |
05/19/92 |
|
310 |
More on the Abrasion of Tape Edges by Reel Flanges |
A. E. E. Rogers |
05/27/92 |
|
311 |
Recorder Controller Monitor Board Changes |
E. Nesman, V. Tran, K. Wilson |
05/28/92 |
|
312 |
Tape Canister Drop Tests |
A. E. E. Rogers, H. F. Hinteregger |
07/10/92 |
|
313 |
Some Calculations of Forces Experienced by Tapes When Dropped |
A. E. E. Rogers |
06/92 |
|
314 |
Minutes of VLBA Recorder Telecon Held 10 June 1992 at 1300 EDT |
A. E. E. Rogers |
06/11/92 |
|
315 |
Low Melting Point of Oxide Binder in AMPEX 741 Tape |
A. E. E. Rogers, D. Callahan |
06/17/92 |
|
316 |
Version 6 of RECON |
R. Cappallo |
06/15/92 |
|
317 |
Elastic Modulus Measurements for Thin Tape |
D. Callahan, A. E. E. Rogers |
06/18/92 |
|
318 |
Tape Loop Clearance Tolerance |
A. E. E. Rogers |
06/23/92 |
|
319 |
Tape Winding and Stretched Tape |
A. E. E. Rogers |
06/25/92 |
|
320 |
Wear Tests on Short Tapes |
A. E. E. Rogers |
07/30/92 |
|
321 |
Factors Which Influence the Tape Wind Test |
A. E. E. Rogers |
07/01/92 |
|
322 |
The Effect of Debris on Tape Packing |
A. E. E. Rogers |
07/92 |
|
323 |
Accelerated Thin Tape Test: Status Report |
A. E. E. Rogers |
07/06/92 |
|
324 |
A Simple Method To Measure Friction in Vacuum Columns |
A. E. E. Rogers |
07/21/92 |
|
325 |
Elastic Modulus in the Radial Direction for Thin Tapes |
A. E. E. Rogers, D. J. Callahan |
07/13/92 |
|
326 |
Edge Guiding Force Variation with Vacuum Door Clearance |
A. E. E. Rogers |
07/23/92 |
|
327 |
A Physical Model for the Effect of Relative Humidity on Edge Contact Deposits |
A. E. E. Rogers |
07/28/92 |
|
328 |
Humidity Tests of the Tape Cannister |
D. Callahan, A. E. E. Rogers |
08/04/92 |
|
329 |
Proposal for Bypassing Barrel Roll and System Track Substitution When Using the VLBA Formatter Data Buffer Module |
C. Janes, R. Treacy |
07/24/92 |
|
330 |
Capstan and Idler Alignment Tests |
A. E. E. Rogers, K. Wilson, H. F. Hinteregger |
08/07/92 |
|
331 |
Cost Estimate for Thin Tape Upgrade |
A. E. E. Rogers, H. F. Hinteregger, M. W. McDonough |
08/04/92 |
|
332 |
Magnetic Tape Surface Resistivity Variation with Relative Humidity |
D. Callahan, A. E. E. Rogers |
08/05/92 |
|
333 |
Thin Tape Upgrade - Changes/Additions To VLBA Acquisition Memo #290 |
A. E. E. Rogers, H. F. Hinteregger, K. Wilson |
09/04/92 |
|
334 |
Influence of Axis Misalignment on Edge Guiding Force |
A. E. E. Rogers |
08/07/92 |
|
335 |
Types of Deposit and Their Independence on Humidity |
A. E. E. Rogers |
08/26/92 |
|
336 |
16 Passes with a 2 µm Guard Band |
D. Smythe |
08/21/92 |
|
337 |
Preliminary MCB Protocol for Digital Switch and Tone Extractor |
A. E. E. Rogers, E. F. Nesman |
10/05/92 |
|
338 |
Minutes of VLBA Tape Review Meeting Held 14 September 1992 |
A. E. E. Rogers |
09/16/92 |
|
339 |
Record Spacing Loss Measurement for D1 Tape |
A. E. E. Rogers |
09/23/92 |
|
340 |
Accelerated Thin Tape Tests: Status Report Update |
A. E. E. Rogers |
09/29/92 |
|
341 |
Failure of Ampex Tape Under Low Humidity Conditions |
A. E. E. Rogers, H. F. Hinteregger |
10/14/92 |
|
342 |
Theoretical Wear Profiles for Headstack with Soft Spacers |
A. E. E. Rogers, H. F. Hinteregger |
10/08/92 |
|
343 |
Minutes of Telecon held 9 December 1992 at 1300 EDT |
A. E. E. Rogers |
12/10/92 |
|
344 |
Minutes of VLBA Recorder Telecon, Held 1300 EST 14 Oct 92 |
A. E. E. Rogers |
10/15/92 |
|
345 |
Update of Self-Packing Reel Specifications |
H. F. Hinteregger |
12/07/92 |
|
346 |
Further Improvement of Write Driver Peformance |
V. A. Tran, K. M. Wilson |
12/31/92 |
|
347 |
Digital Tone Extractor Normalization |
A. E. E. Rogers |
01/08/93 |
|
348 |
Robust and Marginal Tapes: The Shape-of-Edge Difference, Extreme Wind and Shuttle Tests, High Tg Ampex Samples Looking Good |
H. F. Hinteregger |
01/08/93 |
|
349 |
Thin Tape Upgrade - Summary of Parts, Drawings, Assembly and Test |
A. E. E. Rogers, K. Wilson, G. Peck, H. Hinteregger |
02/02/93 |
|
350 |
Version 7 of RECON |
R. Cappallo |
01/27/93 |
|
351 |
Minutes of VLBA Recorder Telecon Held 17 February 1993 at 1300 EST |
A. E. E. Rogers |
02/18/93 |
|
352 |
Headstack Specification for Mk3A/VLBA/Mk4 Compatibility (REF. DWG. 6310-116) |
H. Hinteregger |
03/11/93 |
|
353 |
Suggested Use of NPN Transistor in BBC Oscillator for Lower Phase Noise |
A. E. E. Rogers |
03/30/93 |
|
354 |
Local Oscillator Phase Stability Specification for the Baseband Converter Modules |
A. R. Thompson |
03/11/93 |
|
355 |
Minutes of Recorder Telecon Held 21 April 1993 at 1300 EDT |
A. E. E. Rogers |
04/26/93 |
|
356 |
Methods for Further Reduction in Head Flying and Head Wear |
A. E. E. Rogers |
05/24/93 |
|
357 |
Minutes of Telecon Held 16 June 1993 at 1300 EDT |
A. E. E. Rogers |
06/25/93 |
|
358 |
Tape Packing at Low Tensions |
C. Lam, A. E. E. Rogers |
07/26/93 |
|
359 |
Playback Drive Inrush Current, Thermistor Tests |
B. Martin |
07/23/93 |
|
360 |
Simple Method of Checking Reel Motor Torque |
A. E. E. Rogers |
08/09/93 |
|
361 |
Reel Servo Stability Margin |
A. E. E. Rogers |
08/93 |
|
362 |
An Evaluation of the Jodrell Bank Headstacks |
A. E. E. Rogers, P. Bolis, H. F. Hinteregger |
08/02/93 |
|
363 |
Performance Maintenance and Head Wear |
H. F. Hinteregger |
08/04/93 |
|
364 |
The Accelerated Tape Test |
C. Janes |
08/03/93 |
|
365 |
Preliminary Tests of Modified "Triple Cap" Contour |
A. E. E. Rogers |
08/12/93 |
|
366 |
Methods of Remotely Monitoring Power Supply Voltages In VLBA Equipment Racks |
B. Martin |
08/17/93 |
|
367 |
Procedure for Testing Frequency Response of R131 Read Modules and R132 Parallel Reproduce Modules for the VLBA Tape Recorder |
B. Martin |
08/20/93 |
|
368 |
Wear Rates, Head Flying and Performance of the Current Head Design at Various Operating Tensions |
C. Lam, A. E. E. Rogers, H. Hinteregger |
09/01/93 |
|
369 |
Wear Rates for Heads With Fotoceram and MN130 Spacer Material |
A. E. E. Rogers |
09/08/93 |
|
370 |
Test procedure for R131 Read Modules and R132 Parallel Reproduce Modules |
D. Smythe, P. Bolis |
09/16/93 |
|
371 |
Reel servo/driver configuration and Margin Analysis, Recommendations for More Reliable Operation at 320 ips Maximum |
H. F. Hinteregger |
09/24/93 |
|
372 |
Contours of "Triple-Cap" Heads |
A. E. E. Rogers |
10/20/93 |
|
373 |
Recorder Telecon Held 20 October 1993 at 1300 EDT |
A. E. E. Rogers |
10/25/93 |
|
374 |
Accelerated Thin Tape Test II |
C. Janes |
11/01/93 |
|
375 |
Model for Recorder Tracking Response To Capstan and Idler Surface Irregular |
A. E. E. Rogers |
11/24/93 |
|
376 |
Missing |
- |
05/93 |
|
377 |
Thin Tape Transfer Status |
C. Janes |
12/14/93 |
|
378 |
Tolerances for VLBA Sampling Level |
D. Bagri |
02/07/94 |
|
379 |
Recovery of Shock-Deformed Tape |
H. F. Hinteregger, D. L. Smythe |
03/14/94 |
|
380 |
Minutes of VLBA Recorder Telecon Held 16 February 1994 |
A. E. E. Rogers |
02/18/94 |
|
381 |
Minutes of Recorder Telecon Held 20 April 1994 at 1300 EDT |
A. E. E. Rogers |
0$/25/94 |
|
382 |
Minutes of VLBA Recorder Telecon Held 15 June 1994 at 1300 EDT |
A. E. E. Rogers |
08/94 |
|
383 |
Minutes of VLBA Recorder Telecon Held 17 August 1994 |
A. E. E. Rogers |
08/30/94 |
|
384 |
Measurements of Recorder Head Profiles and Changes in the Profile with Tape Speed |
S. Gross, A. E. E. Rogers, H. F. Hinteregger |
10/94 |
|
385 |
Minutes of Telecon Held 19 October 1994 at 1300 EDT |
A. E. E. Rogers |
10/20/94 |
|
386 |
Minutes of Recorder Telecon held 21 December 1994 at 1300 EDT |
A. E. E. Rogers |
12/22/94 |
|
387 |
Minutes of VLBA Recorder Telecon Held 21 December 1994 at 1300 EDT |
H. F. Hinteregger |
02/17/95 |
|
388 |
Much Better than Expected Thin-film MR Head Performance Observed |
H. F. Hinteregger |
03/25/95 |
|
389 |
Minutes of Recorder Telecon Held 19 April 1995 at 1300 EST |
A. E. E. Rogers |
04/20/95 |
|
390 |
Modellings and Evaluation of the Current Head-Stack |
S. Müftü |
05/10/95 |
|
391 |
The Effect of Air Flow and Tension on the Exit Side Behavior of a Flat Contoured Recording Head |
S. Müftü |
05/09/95 |
|
392 |
Minutes of Telecon Held 20 December 1995 at 1:00 P.M. EST |
A. E. E. Rogers |
12/21/95 |
|
393 |
Mark IIIA/IV/VLBA Tape Formats, Recording Modes, and Compatibility |
A. R. Whitney |
12/27/95 |
|
394 |
Summary of Specifications for Geodetic 14-BBC DAR |
F. Ghigo |
01/31/96 |
|
395 |
Minutes of 1st International Telecon on VLBI Recording held on 8 February 1996, 10:00 A.M. EST [15:00 UT] |
H. F. Hinteregger |
02/28/96 |
|
396 |
Minutes of Telecon Held November 7th, 1996, 10:05-11:30 am (EST) |
H. Hinteregger, S. Müftü |
01/09/97 |
|
397 |
Modelling Results on the Long Term Reliability of the Flat Head Interface: I |
S. Müftü |
03/04/97 |
|
398 |
Minutes of VLBA Recording Telecon Held on 13 February 1997 |
G. Peck |
06/13/97 |
|
399 |
VLBA One Gigabit per Second Tape Drive Upgrade |
G. Peck, S. Durand |
03/27/00 |
|
400 |
NRAO Clock Recovery Test Fixture Senior Design Project |
F. Martinez, M. Nunez, S. J. Padilla |
05/09/01 |
|
401 |
Formatter Upgrade 512 Mbps |
S. Durand, D. McKee |
08/02/01 |
Original |
402 |
VLBA Thin Tape Recorder Module QA, Calibration and Support Documents |
S. Thompson |
08/02 |
Original |
403 |
Sampler QA Procedure |
S. Durand, D. Gerrard |
02/04 |
Original |
404 |
Mark 5 Module Assembly Instruction |
D. Gerrard |
06/04 |
Original |
405 |
Remote Power Up Feature for the Mark 5 Data Recording Units |
D. Gerrard |
07/04 |
Original |