Memo Number |
Title |
Author(s) |
Date |
1 |
VLBA Design Study |
K. I. Kellermann |
05/22/80 |
2 |
Antennas for the VLBI |
J. W. Findlay |
06/09/80 |
3 |
25-m Radio Telescope Design for the VLB Array Project |
W.-Y. Wong |
07/07/80 |
4 |
VLBI Array Computer Usage |
W. Cotton, J. Benson |
07/03/80 |
4-A |
VLBI Array Computer Usage |
W. Cotton, J. Benson |
07/03/80 |
5 |
Some Remarks About the Sensitivity of a Partially Coherent Array |
[Clark] |
[1980] |
6 |
VLBI Cost Estimates |
M. Balister |
04/16/80 |
7 |
Proposed Receiver for the VLBI Array |
[Balister] |
[1980] |
8 |
A Mental Exercise on Cost Estm. for the Wong Antenna |
W.-Y. Wong |
08/14/80 |
9 |
Balsa-Wood-Core Test Plates |
W.-Y. Wong |
07/17/80 |
10 |
Notes on Visit To ASULAB; Neuchatel, Switzerland, June 18, 1980 |
K. I. Kellermann |
07/09/80 |
11 |
Digital Data Transmission System |
[Weinreb] |
07/24/80 |
12 |
VLBA Design Study |
W. G. Horne |
08/08/80 |
13 |
VLB Array Site Development Program |
Peery |
08/21/80 |
14 |
VLB Array Antenna Construction Program |
K. I. Kellermann |
08/22/80 |
15 |
Antenna Design Details |
W.-Y. Wong |
[07/80] |
16 |
Masers and VLBI Array |
M. Balister |
08/15/80 |
17 |
VLB Array |
A. R. Thompson |
08/15/80 |
18 |
Computer Usage: Or How Much Is That In Real Money? |
W. Cotton, J. Benson |
08/28/80 |
18-A |
Computer Usage: Or How Much Is That In Real Money? |
W. Cotton, J. Benson |
08/28/80 |
19 |
Computer Needs |
R. C. Walker, B. Burns |
[09/80] |
20 |
Construction Program |
[Hvatum] |
[09/80] |
21 |
Proposals for a Prelimary VLA Spectral Line System |
A. M. Shalloway |
06/75 |
22 |
A Possible Feed System for the VLBA Antenna |
P. J. Napier |
08/26/80 |
23 |
Alternative Data Communication Systems |
G. W. Swenson |
[1980] |
24 |
Automatic VLBI Observing |
G. W. Swenson |
[1980] |
25 |
Self-Calibration With a Low SNR |
F. Schwab |
06/03/80 |
26 |
VLBA Receiver |
M. Balister |
05/20/81 |
27 |
Size of Antenna Elements for the VLB Array |
K. I. Kellermann |
07/16/81 |
28 |
Tape Recording Systems for the VLB Array |
K. I. Kellermann |
07/16/81 |
29 |
Multiple Processor Sites for the VLB Array |
K. I. Kellermann |
07/24/81 |
30 |
A Single Carrier Satellite LO System |
B. G. Clark |
08/81 |
31 |
Questions To Be Addressed |
[Kellermann] |
10/19/81 |
32 |
Planning Committee |
K. I. Kellermann |
10/21/81 |
33 |
VLBA Working Groups |
K. I. Kellermann |
10/26/81 |
34 |
VLB Array |
K. I. Kellermann |
10/26/81 |
35 |
Questions To Be Considered for the VLBA |
K. I. Kellermann |
10/29/81 |
36 |
VLBA Proposal Group |
[Hvatum] |
[11/81] |
37 |
VLBA Proposal |
H. Hvatum |
11/02/81 |
38 |
Critique of Feb. 1981 VLBA Design Study |
R. M. Hjellming |
11/13/81 |
39 |
Remarks on the VLBA Report |
B. Clark |
11/10/81 |
40 |
VLBA Meeting, November 16, 1981 |
K. I. Kellermann |
11/17/81 |
41 |
VLB Array Funding Plan |
K. I. Kellermann |
11/25/81 |
42 |
VLBA Correlator - What Could the VLA Correlator Do For Us? |
B. G. Clark |
12/04/81 |
43 |
VLBA Meeting |
K. Kellermann |
12/16/81 |
44 |
Recording Systems |
R. P. Escoffier |
12/17/81 |
45 |
Dec. 18 Meeting |
K. I. Kellermann |
12/23/81 |
46 |
Draft of Configuration Section |
R. C. Walker |
12/31/81 |
47 |
Data Storage Requirements for the VLBA |
R. C. Walker |
12/31/81 |
48 |
Receiver Block Diagram and Test Equipment Budget |
C. Moore |
01/04/82 |
49 |
Studies of Array Dynamic Ranges |
[Linfield] |
[12/81] |
50 |
VLBI ~ Cost Estimate Antennas |
W. Horne |
12/04/81 |
51 |
VLBA Proposal - Monitor and Control Chapter |
S. Weinreb |
01/12/82 |
52 |
VLBA Proposal - Front End System |
M. Balister |
01/11/82 |
53 |
Suggested Numbers of Spare Modules for the VLB Array |
A. R. Thompson |
01/07/82 |
54 |
Agenda, Meeting Jan. 26, 1500 EST |
K. I. Kellermann |
01/19/82 |
55 |
Hardware Cost Estimate for Receiver Section of H-Maser Frequency Standard |
R. Mauzy |
01/20/82 |
56 |
VLBA Recording System - Draft #2 |
R. P. Escoffier |
01/20/82 |
57 |
Data Digitization Electronics |
R. Lacasse |
01/20/82 |
58 |
VLBA Proposal - Appendix I: Front-End System |
C. Moore |
01/21/82 |
58-A |
Appendix I: Front-End System |
C. Moore |
06/22/82 |
59 |
A Revised Proposal for a Feed System for the VLBA Antenna |
P. J. Napier |
01/11/82 |
60 |
Cost of Alternative Data Digitization Electronics |
R. J. Lacasse |
01/22/82 |
61 |
The VLBA Playback Correlator System |
B. Clark |
01/26/82 |
62 |
Local Oscillator System Draft |
S. Weinreb, C. Moore |
01/15/82 |
63 |
VLBA Proposal - Front End System: VLB Array Memo No. 52 |
C. Moore |
01/19/82 |
64 |
Draft #3 I. The Array Record System |
R. Escoffier |
01/27/82 |
65 |
Hydrogen Maser Cost Estimate |
C. Moore |
01/28/82 |
66 |
Recommended General and Digital Test Equipment |
R. Lacasse |
01/28/82 |
67 |
VLBA Construction |
[Kellermann] |
[01/82] |
67 |
Power Supply Pins and Keying Scheme for VLBA Module Connectors |
A. R. Thompson |
06/11/86 |
68 |
VLB Correlator Cost - Not Including Playback Tape Systems |
B. Clark |
01/29/82 |
69 |
Spare Partsfor the VLB Array |
K. Kellermann |
02/04/82 |
70 |
Agenda for VLBA Meeting, February 9, 1500 EST |
K. Kellermann |
02/05/82 |
71 |
VI. Cost Estimates |
K. Kellermann |
02/05/82 |
72 |
VLBI Array Post Processing Requirements |
R. D. Ekers |
02/03/82 |
73 |
VLBA Correlator Design |
M. Ewing |
02/04/82 |
74 |
VI. Cost Estimates |
[Kellermann] |
02/12/82 |
75 |
The VLBA Playback Correlator System |
B. Clark |
02/16/82 |
76 |
Comments for VLBA Design Group |
A. E. E. Rogers, H. Hinteregger |
02/08/82 |
77 |
Addition to VLBA Front_end Draft |
C. Moore |
02/03/82 |
78 |
VLBA Recording System - Draft #4 |
R. Escoffier |
02/22/82 |
78-A |
I. Array Record System |
R. Escoffier |
06/17/82 |
79 |
Notes on the Planning Committee Meeting, Feb. 16, 1982 |
K. I. Kellermann |
03/01/82 |
80 |
VLBA Element Operating Probability Using VLA Reliability Data |
J. Campbell |
03/05/82 |
81 |
Frequency Protection for Transcontinental Radio Telescope |
A. R. Thompson |
03/82 |
82 |
Global Fringe Search Techniques for VLBI |
F. R. Schwab |
04/82 |
82-A |
Errata: Global Fringe Search Techniques for VLBI |
F. R. Schwab |
04/82 |
82-B |
Global Fringe Search Techniques for VLBI |
F. R. Schwab, W. D. Cotton |
06/82 |
83 |
VLBA Meeting |
K. Kellermann |
04/15/82 |
84 |
A Design Study for a Dedicated VLBI Array |
R. L. Mutel, R. A. Gaume |
05/19/82 |
85 |
VLBA Meeting |
K. Kellermann |
05/04/82 |
86 |
Building Costs in Socorro and Albuquerque |
P. Napier |
05/10/82 |
87 |
Argentina Telescope |
E. Bajaja, K. I. Kellermann |
06/01/82 |
88 |
Mobile Radio Astronomy System |
K. I. Kellermann |
06/02/82 |
89 |
What Next? |
R. C. Walker |
06/07/82 |
90 |
Technical Memoranda and Reports |
K. I. Kellermann |
06/07/82 |
91 |
National New Technology Telescope: Technology Development Program Report 2: Remote Observing Experiments at Kitt Peak National Observatory |
W. Robinson, P. Schechter, C. Janes |
03/82 |
92 |
Construction Plan/Schedule for the VLBA |
H. Hvatum |
06/09/82 |
93 |
Data Digitization Electronics, Draft 2 |
R. Lacasse |
06/10/82 |
94 |
Self-Maintenanance for VLA Computers |
D. S. Retallack |
04/82 |
95 |
VLBI Array Computer Usage: Fringe Fitting |
W. Cotton |
06/82 |
96 |
Array Dynamic Ranges |
R. S. Simon, R. Linfield, S. Unwin, T. Lockhart |
07/08/80 |
97 |
An Atlas of Transfer Functions for Possible VLBI Arrays |
R. C. Walker |
06/23/82 |
98 |
Post Processing Computer Configuration |
R. Ekers |
06/30/82 |
99 |
Things To Consider for the VLBA Sites |
H. Hvatum, B. Peery |
07/01/82 |
101 |
Possible Block Diagram for VLBA Correlator |
R. Escoffier |
07/15/82 |
102 |
VLBA Correlator Design Group |
[Ewing] |
07/13/82 |
103 |
Preliminary VLBA Planning Groups |
[Hvatum] |
07/14/82 |
104 |
VLBA Processor Group Meetings |
H. Hvatum |
07/23/82 |
105 |
Progress Report for the August 4th Meeting of the Configuration Group |
F. Schwab |
07/82 |
106 |
Dirty Beam Maps of Various Array Configurations |
J. M. Benson |
07/28/82 |
107 |
VLBA Electronics Group |
M. Balister |
08/06/82 |
108 |
VLBA Data Recording Group Meeting |
H. Hvatum |
08/06/82 |
109 |
New Telephone Number VLBA Processor Group Meeting |
H. Hvatum |
08/06/82 |
110 |
VLBA Overall Dataflow |
M. S. Ewing |
08/06/82 |
111 |
Number of Channels for VLBA: Comparison of 2 Schemes |
A. E. E. Rogers |
08/09/82 |
112 |
Elimination of "Bit Shifting" Sidelobes - New Bit Shift Corrections for Automatic Bit Shift Mode |
A. E. E. Rogers |
08/10/82 |
113 |
Minutes of VLBA Electronics Group Meeting |
M. Balister |
08/13/82 |
114 |
Correlator Design Group Telephone Meeting |
[Ewing] |
08/10/82 |
115 |
Minutes of the Telecon Meeting Held 10 Aug. 82 at 1:30 p.m. EDT |
A. E. E. Rogers |
08/11/82 |
116 |
Minutes of the August 5, 1982 VLBA Computer Meeting |
R. Burns |
08/13/82 |
117 |
VLSI for Multi-Lag Cross-Correlator Circuit Cross-Correlator Slice (CCS) |
J. Peterson |
08/16/82 |
118 |
Application of a VLSI Correlator Chip |
J. Peterson |
08/16/82 |
119 |
13 August 1982 VLBA Overseer Group Meeting |
H. Hvatum |
08/18/82 |
120 |
Frequency Multiplexed Correlators: The Recording Format |
B. G. Clark |
08/25/82 |
121 |
VLBA Data System Block Diagram |
B. G. Clark |
08/25/82 |
122 |
Australian Telescope |
H. Hvatum |
09/01/82 |
123 |
Telescope Sites |
B. Brundage, B. Peery |
08/30/82 |
124 |
A Systematic Search for Ten Station VLB Array Geometries |
R. Mutel, R. Gaume |
09/13/82 |
125 |
Astrometric Data Processing With a VLBA |
D. Shaffer |
09/17/82 |
126 |
Post-Processing Software System for VLBA COntinuum Observations |
J. M. Benson |
09/29/82 |
128 |
VLBA Computer Control for Observing: The Mark III Experience |
N. R. Vandenberg |
10/01/82 |
129 |
VLBA Data Recording Group Meeting - October 19, 1982 |
H. Hvatum |
10/08/82 |
130 |
Minutes of Correlator Group Meeting of 5 Oct., 1982 |
M. Ewing |
10/06/82 |
131 |
Antenna Control Computer Option |
M. S. Ewing |
10/08/82 |
132 |
Minutes of the VLBA Recorder Group Meeting Held Tuesday 5 Oct 82 at 1430 EDT |
[Rogers] |
10/07/82 |
133 |
VLBA Bookkeeping Operations |
T. J. Pearson |
10/18/82 |
134 |
Current Status of the Configuration Search |
R. C. Walker |
10/22/82 |
135 |
Minutes of VLBA Recorder Group Telecon Meeting Held 19 Oct 82 at 1430 EDT |
[Rogers] |
[10/82] |
136 |
National Bureau of Standards Climatic Charts |
J. Benson |
10/21/82 |
137 |
Preliminary Record/Playback System Interface Specifications |
R. Escoffier |
10/26/82 |
138 |
The Implications of Geodetic and Astrometric Observations on the VLBA IF Processor Design |
C. Moore |
10/29/82 |
139 |
Radiosonde Data from Puerto Rico |
D. Hogg |
10/29/82 |
140 |
Proposed Recorder Interface for VLBA |
Haystack VLBI Group |
10/07/82 |
141 |
Some Suggested Changes and Improvements to MK III Which Might Be Appropriate for the VLBA |
Haystack VLBI Group |
10/07/82 |
142 |
IF-Tape-Correlator Interfaces |
M. S. Ewing |
11/04/82 |
143 |
A Possible Configuration |
C. Walker |
11/12/82 |
144 |
Fast Quality Measure |
R. C. Walker |
11/12/82 |
145 |
Minutes of Correlator Group Meeting of 9 Nov., 1982 |
M. Ewing |
11/11/82 |
146 |
Minutes of VLBA Electronics Group Meeting - Nov. 10, 1982 |
M. Balister |
11/15/82 |
147 |
Experience With Unattended Telescope Operation Under Computer Control at Michigan |
H. D. Aller |
11/16/82 |
148 |
How Many Frequency Channels Does the VLBA Need? |
D. B. Shaffer |
11/82 |
149 |
VLBA Scientific Group Meeting - December 10, 1982 |
K. Kellermann |
11/29/82 |
150 |
Hail |
R. C. Walker |
11/30/82 |
151 |
Number of IF Bands |
R. C. Walker |
11/30/82 |
152 |
November Meeting Notes |
R. C. Walker |
11/30/82 |
153 |
VLBA Software Requirements |
R. C. Walker |
[11/82] |
154 |
Slew and Setting Rates for VLBA Antennas |
A. E. E. Rogers, H. F. Hinteregger, A. R. Whitney |
11/26/82 |
155 |
Agenda for December 10th Meeting |
K. Kellermann |
12/03/82 |
156 |
Updated Lists |
H. Hvatum |
12/03/82 |
157 |
Possible VLBA Sites |
R. C. Walker |
12/06/82 |
158 |
Minutes of VLBA Recorder Group Telecon Meeting Held 7 Dec 82 at 1430 EST |
[Rogers] |
12/08/82 |
159 |
VLBA Requirements for Live-Time Fringe Checks |
M. H. Schneps |
12/15/82 |
160 |
Slew Rates for VLBA Antennas |
W. G. Horne |
12/14/82 |
161 |
Ball Aerospace MRAS Concept for the VLBA |
C. Moore |
12/17/82 |
162 |
VLBA Data Structures |
T. J. Pearson |
12/11/82 |
163 |
VLBA Schedule and Telescope Control Philosophy |
M. Reid |
12/14/82 |
164 |
VLBI "Channelization |
Haystack VLBI Group |
01/03/83 |
165 |
Meeting on February 9 |
K. Kellermann, H. Hvatum |
01/13/83 |
166 |
VLBA Antenna Control Computer |
G. Hunt |
01/11/83 |
167 |
AIPS Database Structure |
W. D. Cotton |
01/12/83 |
168 |
Minutes of the VLBA Recorder Group Telecon Meeting Held 18 Jan 83 at 1430 EST |
[Rogers] |
01/18/83 |
169 |
Minutes of VLBA Electronics Group Meeting-January 19, 1983 |
M. Balister |
01/24/83 |
170 |
A 32-Channel IF Scheme for the VLBA |
C. R. Moore |
01/24/83 |
171 |
February 9th Meeting |
K. I. Kellermann |
01/28/83 |
172 |
Telescope Sites |
B. Horne |
01/31/83 |
173 |
Radio Link Between VLBA and VLA Antennas |
K. I. Kellermann |
02/07/83 |
174 |
LES 8/9 |
W. W. Ward |
06/21/82 |
175 |
Tables of Contents for VLBA Station Observing Logs and Processor Log Files |
J. M. Benson |
02/03/83 |
176 |
VLBA Correlator Design Group Draft Correlator Specification |
M. Ewing |
02/06/83 |
177 |
CLBA Technical Subcommittee Chairmen |
A. H. Bridle |
02/14/83 |
178 |
Phased Arrays As VLBA Elements |
J. M. Moran |
12/22/82 |
179 |
Some Remarks About Three-Level Sampling |
B. G. Clark |
02/15/83 |
180 |
Minutes of the Correlator Group Meeting of 15 Feb., 1983 |
M. Ewing |
02/15/83 |
181 |
(U,V) Sampling Comparisons of VLBA, CLBA, and a Joint Array |
R. C. Walker, A. H. Bridle |
02/18/83 |
182 |
Change In Meeting Schedule |
[C. Burgess] |
02/18/83 |
183 |
Miscellaneous Correlator Issues |
M. Ewing |
02/17/83 |
184 |
Correlator "176" vs an "Ideal" System |
M. Ewing |
02/17/83 |
185 |
Minutes of VLBA Recorder Group Meeting Held 15 February 1983 at 1430 EST |
[Rogers] |
02/18/83 |
186 |
Multi-Level Sampling Options for VLBA |
A. E. E. Rogers, A. R. Whitney |
02/17/83 |
187 |
The Role of Antenna Size in Selfcalibration |
T. J. Cornwell |
02/22/83 |
189 |
VLBA/CLBA Construction Cost Estimate Comparison |
A. Bridle |
03/03/83 |
190 |
Update of Lists |
H. Hvatum |
03/08/83 |
191 |
Control Building |
B. Peery |
03/07/83 |
192 |
Signal Quantization in the VLB array |
A. R. Thompson |
03/04/83 |
193 |
Antenna Elevation - Angle Cut-Off |
I. Shapiro |
03/02/83 |
194 |
An Optimized Ten-Station Array |
R. Mutel, R. Gaume |
03/07/83 |
195 |
Change in VLBA Electronics Group Meeting |
M. Balister |
03/14/83 |
196 |
Report of Ad Hoc Committee on Sampling and Channels |
B. Clark |
03/14/83 |
197 |
VLB Array Memo No. 176 |
B. Rayhrer |
03/02/83 |
198 |
VLBA Scientific Working Group Action Items, March 11 Meeting |
K. I. Kellermann |
03/17/83 |
199 |
Minutes of VLBA recorder group meeting held 15 March 1983 at 1430 EST |
[Rogers] |
03/16/83 |
200 |
VLBA and CLBA Cost Discrepancies |
K. I. Kellermann |
03/16/83 |
201 |
Memo 191, Control Building |
W. G. Horne |
03/21/83 |
202 |
Bandwidth Synthesis With Two Channels |
B. G. Clark |
03/21/83 |
203 |
Minutes of VLBA Electronics Group Meeting - March 28, 1983 |
M. Balister |
03/30/83 |
204 |
Time and Frequency Averaging |
W. D. Cotton, J. M. Benson |
03/10/83 |
205 |
Final Configuration |
R. C. Walker |
03/28/83 |
206 |
Working Group Feedback |
R. M. Price |
03/17/83 |
207 |
Control Building |
P. Crane |
03/21/83 |
208 |
Objectives of the Operations Group |
R. C. Bignell |
04/06/83 |
209 |
RFI and Meteorological Environments at Haleakala Observatory, Maui, Hawaii |
W. Brundage, G. Peery |
04/13/83 |
210 |
The No-Computer Option for Antenna Control |
L. R. D'Addario |
04/14/83 |
211 |
Issues to Be Addressed By the Subgroup |
L. R. D'Addario |
04/14/83 |
212 |
Monitor and Control Channel Usage and Capacity at the VLA |
D. Weber |
04/13/83 |
213 |
Link Budgetary Estimates |
J. Coe |
04/18/83 |
214 |
VLBA Processor Operations |
R. C. Walker |
04/21/83 |
215 |
Minutes of Monitor and Control Subgroup Meeting on 830419 |
L. R. D'Addario |
04/25/83 |
216 |
Minutes of VLBA Feed Subgroup Meeting - 13 April, 1983 |
P. J. Napier |
04/19/83 |
217 |
Timing Tests of Fringe Processor Operations |
J. M. Benson, W. D. Cotton |
[04/83] |
218 |
VLBA IF/LO/MASER Subgroup: Proposed Receiver Sky, LO, and Image Frequencies |
C. Moore |
04/19/83 |
219 |
More (!) Meetings |
H. Hvatum |
04/29/83 |
220 |
Site Selection - VLBA |
B. Horne |
04/27/83 |
221 |
Operational Requirements: Image Formation and Analysis |
W. D. Cotton |
04/27/83 |
222 |
VLBA Control Building and Service Facilities |
W. G. Horne |
04/26/83 |
223 |
Minutes of the VLBA Computer Meeting - 4/26/83: Fringe Processing |
W. R. Burns |
04/29/83 |
224 |
Tasks of the VLBA Element Control Computer |
T. J. Pearson |
05/03/83 |
225 |
Canadian Long Baseline Array Current Activity |
J. Galt |
04/16/83 |
226 |
Restructuring the Configuration Group |
R. C. Walker |
05/11/83 |
227 |
Bands and Recording Rate |
A. E. E. Rogers |
04/14/83 |
228 |
Report of A.T. System Concept Workshop Held at Parkes, 7-9 December 1982 |
R. H. Frater |
12/09/82 |
229 |
1980 Wind Data |
[Peery] |
05/10/83 |
230 |
Correlator Operations - Tape Changing |
M. Ewing |
05/13/83 |
231 |
Specifications for a VLB Water Vapor Radiometer |
D. E. Hogg |
05/10/83 |
232 |
Front-End Schedule |
S. Weinreb |
05/18/83 |
233 |
Revised VLBA Meeting Schedules and Membership List |
H. Hvatum |
05/23/83 |
234 |
Performance of OVRO 40-m Telescope at 43 GHz |
A. Readhead, T. Seling, F. Evans |
05/16/83 |
235 |
K-3 System |
K. I. Kellermann |
05/17/83 |
236 |
Minutes of VLBA Electronics Group Meeting - May 18, 1983 |
M. Balister |
05/26/83 |
237 |
A Low-Risk Canada/US VLB Array Option |
A. H. Bridle, R. C. Walker |
06/07/83 |
238 |
Suggested Table of Contents |
H. Hvatum |
06/09/83 |
239 |
Site Inspection for Northern New Mexico Antenna |
K. I. Kellermann |
06/09/83 |
240 |
Microwave Links |
A. R. Thompson |
06/07/83 |
241 |
Specifications |
[Horne] |
06/14/83 |
242 |
Minutes of VLBA Recorder Group Meeting Held 15 June 1983 at 1430 EDT |
[Rogers] |
06/16/83 |
243 |
Cancellation of VLBA Computer Meeting for June |
R. Burns |
06/21/83 |
244 |
K and Q-Band Maser Construction for the VLBA |
C. Moore |
06/20/83 |
245 |
Minutes of the VLBA Electronics Group Meeting - 6/15/83 |
M. Balister |
06/22/83 |
246 |
Further Notes On Microwave Links |
A. R. Thompson |
07/05/83 |
247 |
Minutes of the Recorder Group Telecon Held 12 July 1983 at 1430 EDT |
[Rogers] |
07/13/83 |
248 |
Minutes of the VLBA Electronics Group Meeting - 7/13/83 |
M. Balister |
07/18/83 |
249 |
Comments on VLBA Memo No. 241 |
P. Napier |
07/20/83 |
250 |
Use of Los Alamos and Alternate Winston Site |
R. C. Walker |
08/07/83 |
251 |
Current Concerns and Meeting Notes |
R. C. Walker |
08/08/83 |
252 |
Accounting for VLBA Project |
J. P. Lagoyda |
08/05/83 |
253 |
Sources of Closure Errors |
A. E. E. Rogers |
08/09/83 |
254 |
A Possible Double-Conversion Receiver Configuration for the VLBA |
L. D'Addario |
08/09/83 |
255 |
Setting the VLBA Antennas |
J. W. Findlay |
08/17/83 |
256 |
Synopsis of VLBA Electronics Meeting of August 17, 1983 |
S. Weinreb |
08/19/83 |
257 |
Revised VLBA Meeting Schedule |
H. Hvatum |
08/23/83 |
258 |
Aug. 24, 1983 Meeting |
R. C. Walker |
08/25/83 |
259 |
VLBA Instrumentation |
B. Carter |
07/18/83 |
260 |
Possible Solar Observations With the VLBA |
M. R. Kundu |
[09/83] |
261 |
Canadian Long Baseline Array |
K. I. Kellermann |
08/30/83 |
262 |
Antenna Schedule - VLBA |
W. Horne |
08/17/83 |
263 |
List of VLBA Memos |
C. Williams |
09/12/83 |
264 |
Accounting for VLBA Project |
J. P. Lagoyda |
09/01/83 |
265 |
Data Communications Systems |
A. Shalloway |
09/15/83 |
266 |
Minutes of Science Working Group Meeting, September 9, 1983 |
K. Kellermann |
[09/83] |
267 |
Mauna Kea As a VLBA Site (Re: VLBA Memo 251) |
B. F. Burke |
09/09/83 |
268 |
Minutes of DA & C Meeting 9/13/83 |
M. Ewing |
[09/83] |
269 |
Minutes of the VLBA Electronics Group Meeting - 9/14/83 |
M. Balister |
09/19/83 |
270 |
Loss Factors in VLBI Correlator |
A. R. Whitney, A. E. E. Rogers |
09/20/83 |
271 |
Possible Site in Merida, Venezuela |
D. C. Backer |
09/22/83 |
272 |
Mauna Kea As a VLBA Site (Re: VLBA Memo 267) |
W. E. Carter |
09/27/83 |
273 |
Minutes of VLBA Data Communications Teleconference - 9/26/83 |
A. Shalloway |
10/04/83 |
274 |
Operations Center Location |
W. J. Welch, D. C. Backer |
10/83 |
275 |
Mauna Kea As a VLBA Site (Cont.) |
B. F. Burke |
10/04/83 |
276 |
Fractional N Synthesizer |
A. T. Moffet |
10/06/83 |
277 |
Minutes of VLBA Recorder Group Meeting Held 11 Oct 83 at 1430 EDT |
A. E. E. Rogers |
10/12/83 |
278 |
General Organization of VLBA Control Software |
B. G. Clark |
10/83 |
279 |
Mauna Kea As a VLBA Site (See Memo Nos. 267 and 275) |
M. A. Gordon |
09/29/83 |
280 |
Minutes of the VLBA Operations Group Meeting - 10/14/83 |
C. Bignell |
10/17/83 |
281 |
VLBA Correlator Memo Series |
M. Ewing |
10/21/83 |
282 |
Response to VLBA Memo No. 274 |
M. S. Roberts |
10/04/83 |
283 |
Fractional Bit Shift etc. and Short Baselines |
R. C. Walker |
[10/83] |
284 |
Minutes of VLBA Electronics Group Meeting - 10/12/83 |
M. Balister |
10/26/83 |
285 |
VLBA Antenna Choice |
B. Horne |
10/07/83 |
286 |
TIW Antenna Panels |
T. Legg |
09/14/83 |
287 |
Notes From Meeting of 19 Oct. 1983 |
R. C. Walker |
10/31/83 |
288 |
Possible Change in the Site Near the VLA |
R. C. Walker |
10/31/83 |
289 |
VLBA Element Operating Probability Using Revised Access Time Data |
J. Campbell |
09/30/83 |
290 |
VLBA Memo 255 Aug 17, 1983 Setting the VLBA Antennas |
W. Horne |
11/03/83 |
291 |
Choice of Site for the Southern N.M. Antenna |
A. R. Thompson |
11/01/83 |
292 |
Site Construction Order |
R. C. Walker |
11/17/83 |
293 |
Minutes of VLBI Recorder Group Meeting Held Monday 7 November 1983, 9:30 AM At NRAO, Charlottesville, VA |
[Rogers] |
11/03/83 |
294 |
Minutes of the VLBA Electronics Group Meeting on November 16, 1983 |
M. Balister |
11/22/83 |
295 |
VLBA Frequency Coverage |
L. R. D'Addario |
11/28/83 |
296 |
Report of the Workshop on Australia Telescope Computer System |
The Australian Telescope |
12/07/83 |
297 |
List of VLBA Memos |
C. Williams |
12/08/83 |
298 |
Bandwidths and Sampling Rates Reconsidered |
L. R. D'Addario |
12/05/83 |
299 |
VLBA Communications Recommendations |
A. Shalloway |
12/15/83 |
300 |
VLBA Computer Advisory Group |
R. Burns |
12/07/83 |
301 |
Site RFI Potential — Possible On-Site Spectrum Measurements by the U.S. Department of Commerce NTIA/ITS RSMS Van |
W. Brundage |
12/09/83 |
302 |
Monitor and Control Bus Specification |
L. R. D'Addario, B. G. Clark, D. Weber, K. Sowinski |
12/20/83 |
303 |
Local Oscillator System Design |
L. R. D'Addario |
12/26/83 |
304 |
VLBA Meeting Schedules |
H. Hvatum |
01/04/84 |
305 |
Directory of VLBA Members |
C. Williams |
01/02/84 |
306 |
6 GHz VLBA Receivers |
M. Reid, J. Moran |
12/27/83 |
307 |
Programming Language for the VLBA Project |
G. Hunt |
12/30/83 |
308 |
VLBA Programming Language |
M. S. Ewing |
01/16/84 |
309 |
Some Notes on the Proposed Mauna Kea Site |
J. Spargo |
01/18/84 |
309-A |
Correction on VLBA Memo #309 |
C. Williams |
01/24/84 |
310 |
Minutes of the VLBA Electronics Group Meeting on January 19, 1984 |
M. Balister |
01/24/84 |
311 |
Excerpt Taken From Letter of Jaap Baars to K. Kellermann, Jan. 16, 1984 |
[Baars] |
01/16/84 |
312 |
A Study of the Water Vapor Fluctuations At Selected Sites in Puerto Rico |
D. E. Hogg |
01/24/84 |
313 |
Revised Operations Group Meeting Schedule |
C. Williams |
01/27/84 |
314 |
Filter Bandwidths for VLBA |
J. M. Moran, M. J. Reid |
01/18/84 |
315 |
February 10 Meeting |
K. Kellermann |
02/02/84 |
316 |
Summary of Design Review Meeting |
L. R. D'Addario |
02/02/84 |
317 |
VLBA Project Book |
L. R. D'Addario |
02/06/84 |
318 |
Notes From Meeting of 18 Jan. 1984. |
R. C. Walker |
[02/84] |
319 |
Weather Instrumentation At VLBA Antennas |
J. Spargo |
02/01/84 |
320 |
Use of Linear Polarization for the VLBA |
B. G. Clark |
02/14/84 |
321 |
Single Sideband Fringe Rotation |
L. R. D'Addario |
02/04/84 |
322 |
Hawaii Antenna |
K. I. Kellermann |
02/21/84 |
323 |
Minutes of the VLBA Electronics Group Meeting - February 16, 1984 |
M. Balister |
02/22/84 |
324 |
Broadband Mapping of Sources With Spatially Varying Spectral Index |
T. Cornwell |
02/84 |
325 |
March 9 Agenda |
K. I. Kellermann |
03/05/84 |
326 |
Fringe Rotation and Variable Phase Sampling |
A. E. E. Rogers, J. C. Webber |
02/23/84 |
327 |
Rejection of Receiver Images for Various VLBI Processing Techniques |
A. E. E. Rogers |
03/01/84 |
328 |
Single Sideband Fringe Rotation - The Effect of the Second Quantization On the Bandpass Filter Function |
A. E. E. Rogers |
02/29/84 |
329 |
Lobe Rotator At the Antenna |
B. Clark |
02/24/84 |
330 |
Potential VLBA Antenna Site At Los Alamos |
P. Napier |
03/06/84 |
331 |
A Configuration Study for the CLBA Planning Committee |
T. H. Legg |
02/06/84 |
332 |
Minimizing Storage Requirements for Quantized Noise (Or, How To Use Less Tape In VLBI) |
L. R. D'Addario |
02/28/84 |
333 |
Variable Phase Sampling |
L. R. D'Addario |
03/16/84 |
334 |
Lobe Rotator Options |
M. S. Ewing |
02/09/84 |
335 |
VLBA Computer Coordination |
R. Burns |
03/20/84 |
336 |
New CLBA Option and the Washington VLBA Site |
A. Bridle |
03/08/84 |
337 |
Comment On the Use of Linearly Polarized Feeds for the VLBA |
F. Schwab |
03/21/84 |
338 |
Minutes of Corr. Group Mtg 14 Mar 84 |
M. S. Ewing |
03/16/84 |
339 |
Conf?/Site Group Meeting 840321 |
B. Peery |
[03/84] |
340 |
140-ft K-Band Maser Noise Temperature |
C. Brockway |
03/26/84 |
341 |
NBS Global Time Service |
R. C. Walker |
03/22/84 |
342 |
VLBA Electronics Meeting, March 15, 198[4] |
A. R. Thompson |
03/19/84 |
343 |
Meeting of 10 April, 1984 |
R. C. Walker |
04/11/84 |
344 |
Computer Personnel for Operation of the VLBA |
R. C. Walker |
04/12/84 |
345 |
Phase And Delay Tracking at Stations: Preliminary Design |
L. D'Addario, J. Romney |
04/13/84 |
346 |
Tolerances On Polarization Mismatch |
A. R. Thompson |
03/84 |
347 |
The Washington Antnena and the Canadian Connection II |
A. Bridle |
04/13/84 |
348 |
Conf./Site Group Mtg. 840418 |
B. Peery |
04/23/84 |
349 |
Further Comments On Phase and Delay Tracking At the Stations |
A. E. E. Rogers, A. R. Whitney |
04/27/84 |
350 |
VLBA Electronics Meeting, April 19, 1984 |
A. R. Thompson |
04/25/84 |
351 |
Pulsar VLBI Specifications |
D. C. Backer |
[04/84] |
352 |
Configuration/Site Group Meeting - 840516 |
B. Peery |
05/23/84 |
353 |
VLBA Electronic Group Meeting, May 17, 1984 |
A. R. Thompson |
05/23/84 |
354 |
VLBA Frequency Coverage: Final Specification |
L. R. D'Addario |
06/12/84 |
355 |
Conf./Site Group Mtg. 840620 |
B. Peery |
06/25/84 |
356 |
Meeting On Antenna Building Requirements |
A. R. Thompson |
06/21/84 |
357 |
VLBA Electronic Group Meeting, June 14, 1984 |
A. R. Thompson |
06/18/84 |
358 |
A Question of Language: C vs FORTRAN, etc. |
M. Ewing |
06/21/84 |
359 |
VLBA Meeting Schedules |
C. Williams |
06/28/84 |
360 |
The NFRA New Generation VLBI Processor: Progress Report On the Correlator Section, June 1984 |
[Ewing] |
[06/84] |
361 |
Pulsar Astrometry and Ionospheric Corrections |
C. Gwinn |
[07/84] |
362 |
VLBA Project Numbers |
B. Porter |
07/13/84 |
363 |
Telephone Conference 840620 RE: Antenna Site Control Building |
B. Peery |
07/13/84 |
364 |
VLBA Documentation Standards |
L. R. D'Addario |
07/13/84 |
365 |
Need for a Large Computer |
R. C. Walker |
07/14/84 |
366 |
Some Suggestions for the AOC Building |
R. C. Walker, J. M. Benson |
07/14/84 |
367 |
Pulsar Dedispersion Mode and Ionospheric Correction |
N. Bartel |
07/09/84 |
368 |
VLBA M&C Standard Interface Specification |
D. Weber, B. Clark |
07/16/84 |
369 |
VLBA Electronic Group Meeting, July 12, 1984 |
A. R. Thompson |
07/19/84 |
370 |
Data Processing Meeting 19 July 1984 |
W. D. Cotton |
07/25/84 |
371 |
Thoughts on VLBA-VLA Editing and Calibration and AIPS |
B. Cotton |
07/18/84 |
372 |
July 84 Meeting |
R. C. Walker |
07/26/84 |
373 |
Conf./Site Meeting 840725 |
B. Peery |
07/30/84 |
374 |
Comments On VLBA Memo No. 363 |
J. Spargo |
08/01/84 |
375 |
Towards A Correlator Option List |
M. S. Ewing |
08/03/84 |
376 |
Scientific Advisory Group Meeting |
K. I. Kellermann |
08/17/84 |
377 |
VLBA Site Building and Equipment |
L. Temple |
08/14/84 |
378 |
Antenna Site Control Building |
J. Spargo |
08/15/84 |
379 |
Data Processing Meeting 14 August 1984 |
W. D. Cotton |
08/22/84 |
380 |
Pulsar Astrometry and Ionospheric Corrections |
I. Shapiro |
08/16/84 |
381 |
Conf./Site Meeting 840822 |
B. Peery |
08/27/84 |
382 |
Revised Specifications for VLBA Hydrogen Maser |
S. Weinreb |
08/27/84 |
383 |
RFI at the Haystack Site |
W. D. Brundage |
08/23/84 |
384 |
VLBA Fringe Processor Tasks |
J. Benson |
08/28/84 |
385 |
Calibration Software |
R. C. Walker |
09/05/84 |
386 |
VLBA Electronic Group Meetings of August 6 & September 6 |
A. R. Thompson |
09/10/84 |
387 |
Monitor and Control; The View From the Top |
J. J. Johovich |
09/18/84 |
388 |
Bit Error Rates |
R. C. Walker |
09/16/84 |
389 |
The Location of the Tucson VLBA Antenna |
R. L. Brown |
09/14/84 |
390 |
Data Processing Meeting 11 September 1984 |
W. D. Cotton |
09/12/84 |
391 |
Conf./Site Meeting 840919 |
B. Peery |
09/25/84 |
392 |
Updated VLBA Correlator Information |
M. Ewing |
09/24/84 |
393 |
DPS/Correlator Interface Meeting 9/27/84 |
M. S. Ewing |
10/01/84 |
394 |
VLBA Correlator: Control Computer and Operating System |
T. J. Pearson, M. S. Ewing |
10/03/84 |
395 |
Fringe Processing - MK III Algorithms |
A. E. E. Rogers |
10/09/84 |
396 |
VLBA Maintenance Computer Needs |
B. G. Clark |
09/84 |
397 |
VLBA Electronics Division Meeting, October 11, 1984 |
D. Thompson |
10/12/84 |
398 |
Crisis in Radio Astronomy |
J. J. Johovich |
10/11/84 |
399 |
VLBA Station Computer: Choice of CPU |
B. G. Clark |
10/84 |
400 |
Data Processing Meeting 16 October 1984 |
W. D. Cotton |
10/17/84 |
401 |
RFI Survey for the VLBA Los Alamos, NM Site (TA 33) August 20 to September 28, 1984 |
J. Oty |
[10/84] |
402 |
Computer Decisions |
R. C. Walker |
10/24/84 |
403 |
Conf./Site Meeting 841024 |
B. Peery |
10/30/84 |
404 |
Visit To Hawaii |
R. C. Walker |
11/09/84 |
405 |
The "Unlimited" Tape Case |
L. R. D'Addario |
11/16/84 |
406 |
VLBA Electronics Meeting, November 8, 1984 |
D. Thompson |
11/19/84 |
407 |
RFI Survey for the VLBA Pie Town, NM Site June 19 to October 19, 1984 |
J. Oty |
[11/84] |
408 |
Model Accountability and Averaging |
R. C. Walker, J. M. Benson |
11/20/84 |
409 |
Data Processing Meeting 13 November 84 |
W. D. Cotton |
11/14/84 |
410 |
Conf./Site Meeting 841121 |
B. Peery |
11/28/84 |
411 |
Diminishing Returns |
H. F. Hinteregger |
11/29/84 |
412 |
Front Ends for 23 and 43 GHz |
A. R. Thompson |
12/04/84 |
413 |
VLBA Electronics Meeting, December 6, 1984 |
D. Thompson |
12/07/84 |
414 |
Data Processing Meeting 11 December 1984 |
W. D. Cotton |
12/12/84 |
415 |
50 cm λ RFI in Massachusetts |
W. Brundage |
12/14/84 |
416 |
VLBA Meeting Schedules |
C. Williams |
12/02/85 |
417 |
Notes from "Dump Rate" Meeting 12/7/84 |
M. S. Ewing |
12/19/84 |
418 |
AOC Correlator Floor Plan |
M. S. Ewing |
12/19/84 |
419 |
Conf./Site Meeting 841219 |
B. Peery |
12/27/84 |
420 |
Data Processing Meeting 8 January 198[5] |
W. D. Cotton, J. D. Romney |
01/09/85 |
421 |
Digitization and Recording Meeting at MIT: Summary |
A. E. E. Rogers |
01/10/85 |
422 |
VLBA Electronics Meeting, Jan 10, 1985 |
D. Thompson |
01/17/85 |
423 |
RFI Survey for the VLBA Kitt Peak, AZ Site |
J. Oty |
12/84 |
424 |
Conf./Site Meeting - 850130 |
B. Peery |
02/04/85 |
425 |
VLBA Corelator: Programming Standards |
T. J. Pearson |
02/06/85 |
426 |
VLBA Electronics Meeting, Feb 7 1985 |
D. Thompson |
02/11/85 |
427 |
The 8/5 Code for Three-Level Quantization: Tape Format Considerations |
L. R. D'Addario |
01/16/85 |
428 |
Interferometer Calibration vs. Quantization |
L. R. D'Addario |
01/16/85 |
429 |
Teleconference I.D. Numbers |
C. Williams |
02/14/85 |
430 |
Summary of Socorro Workshops |
L. D'Addario |
01/30/85 |
431 |
Some Suggested Operator Interface Screens |
B. G. Clark |
01/85 |
432 |
Some Remarks About Phase Switching |
B. G. Clark |
02/85 |
433 |
RFI Survey for the VLBA Three Points, AZ Site (Robles Junction) |
J. Oty |
01/85 |
434 |
Conf./Site Meeting 850220 |
B. Peery |
02/27/85 |
435 |
Proposed Pulsar Support Modes - Draft for Comments |
A. E. E. Rogers |
02/11/85 |
436 |
March 15 Meeting |
K. I. Kellermann |
03/07/85 |
437 |
VLBA Antenna in Green Bank |
G. Seielstad |
10/25/84 |
438 |
Antenna in Green Bank |
C. Walker |
[03/85] |
439 |
Graphics for Engineerg and Operations |
M. Ewing |
03/07/85 |
440 |
VLBA Electronics Meeting, March 7, 1985 |
D. Thompson |
03/14/85 |
441 |
Conf./Site Meeting 850320 |
B. Peery |
03/26/85 |
442 |
VLBA Electronics Meeting, April 4, 1985 - Discussion of the Front-End Monitor and Control System |
D. Thompson |
04/10/85 |
443 |
VLBA Memo Lists |
C. Williams |
04/03/85 |
444 |
Data Processing Meetings 19 Feb and 19 March 1985 |
W. D. Cotton, J. D. Romney |
03/22/85 |
445 |
A Proposal for Tape Recorders for the AT LBA |
R. P. Norris |
[04/85] |
446 |
RFI Survey for the VLBA Ft. Davis, TX Site |
J. Oty |
03/85 |
447 |
Wind Data at the 12-meter Site |
R. L. Brown |
03/12/85 |
448 |
Wind Data in the Tucson Area |
R. L. Brown |
04/05/85 |
449 |
Proposed Pulsar Support Modes |
A. E. E. Rogers, D. C. Backer |
04/16/85 |
450 |
A Study of the Water Vapor Fluctuations at Selected Sites in Hawaii |
D. E. Hogg |
04/23/85 |
451 |
Data Processing Meeting 16 April 1985 |
W. D. Cotton |
04/17/85 |
452 |
VLBA Observing Modes |
J. D. Romney |
05/05/85 |
453 |
VLBA Electronics Meeting, May 2, 1985 |
D. Thompson |
05/06/85 |
454 |
Review of 30 April 1985 Meeting |
C. Walker |
[05/85] |
455 |
RFI Survey for the VLBA North Liberty Radio Observatory Site |
J. Oty |
04/85 |
456 |
Data Processing Meeting 14 May 1985 |
W. D. Cotton |
05/15/85 |
457 |
Review of 21 May 1984 Meeting |
C. Walker |
[05/85] |
458 |
Conf./Site Meeting 850417 |
B. Peery |
05/31/85 |
459 |
Conf./Site Meeting 850522 |
B. Peery |
05/31/85 |
460 |
VLBA Meeting Schedule July - December, 1985 |
C. Williams |
06/10/85 |
461 |
VLBA Electronics Meeting, June 13, 1985 |
D. Thompson |
06/14/85 |
462 |
Pulsars, the Ionosphere, and the VLBA |
I. Shapiro |
06/07/85 |
463 |
Effect of Wind on Pointing |
C. Walker |
[06/85] |
464 |
The Arizona VLBA Site |
C. M. Wade, R. C. Walker, G. M. Peery |
05/85 |
465 |
Conf./Site Meeting 850626 |
B. Peery |
07/09/85 |
466 |
Review of July 2 Meeting |
C. Walker |
[07/85] |
467 |
VLBA Electronics Meeting, July 11, 1985 |
D. Thompson |
07/12/85 |
468 |
Software Related Standards for the VLBA Project |
B. G. Clark |
07/85 |
469 |
The VLBA Database |
J. D. Romney |
07/23/85 |
470 |
Closure Errors |
C. Walker |
07/17/85 |
471 |
Gain Calibration Techniques |
L. R. D'Addario |
07/15/85 |
472 |
Correlated Flux Calibration Techniques for VLBA |
A. E. E. Rogers |
08/06/85 |
473 |
The VLBA Options List |
J. D. Romney |
08/12/85 |
474 |
September 6 Meeting - Options List |
K. I. Kellermann |
08/08/85 |
475 |
Notes on UK - Hawaii Remote Telescope Operations |
K. I. Kellermann |
08/02/85 |
476 |
Conf./Site Meeting 850731 |
B. Peery |
08/15/85 |
477 |
The VLBA Data Acquisition System Report and Its Impact on the AT |
R. P. Norris |
07/31/85 |
478 |
Macintosh Workstations for VLBA - Functional Overview |
M. Ewing |
08/19/85 |
479 |
Digital Filtration Stages in the Correlator |
J. Benson |
08/26/85 |
480 |
Site Group Meeting, 850828 |
C. Wade |
09/03/85 |
481 |
Construction Arrays |
C. Walker |
09/01/85 |
482 |
Alternative To OVRO |
C. Walker |
09/01/85 |
483 |
VLBA Telecommunications |
M. Ewing |
09/09/85 |
484 |
VLBA Electronics Meeting, September 5, 1985 |
D. Thompson |
06/06/85 |
485 |
Selection Criteria for the VLBA Database |
J. D. Romney |
09/09/85 |
486 |
Cost Savings |
G. Seielstad |
09/09/85 |
487 |
Phase Calibration Techniques |
L. R. D'Addario |
09/04/85 |
488 |
The Response of the Very Long Baseline Array To Interfering Signals |
P. C. Crane |
09/11/85 |
489 |
VLBA Test Memo No. 1 |
K. I. Kellermann |
09/18/85 |
490 |
Notes on September 6 Science Group Meeting |
K. I. Kellermann |
09/16/85 |
491 |
Suggested Specifications for "Antenna Fringe Rotation" Module |
A. E. E. Rogers |
09/16/85 |
492 |
Low Fringe Rates - Are They A Problem? |
A. E. E. Rogers |
09/17/85 |
493 |
Cable Wrap Centering for the VLBA |
B. Clark |
09/23/85 |
494 |
RFI Survey for the VLBA North Central Washington Site |
J. Oty |
07/85 |
495 |
RFI Survey for the VLBA Owens Valley Radio Observatory |
J. Oty |
08/85 |
496 |
Compatibility Between the Present VLBA Design for the Data Acquisition System (DAS) and the MklllA Data Acquisition Terminal (DAT) |
A. E. E. Rogers |
09/19/85 |
497 |
Review of 24 Sept. 1985 Meeting |
C. Walker |
09/25/85 |
498 |
VLBA Operational Manpower and Building Space Requirements |
[Bignell] |
09/20/85 |
499 |
Site Group Meeting, 850925 |
C. Wade |
09/26/85 |
500 |
Bandwidth Expansion Paths |
L. R. D'Addario |
09/13/85 |
501 |
Electronics Meeting, October 3, 1985 |
D. Thompson |
10/07/85 |
502 |
Proposal for Device Determination of Standard Interface Addressing |
B. G. Clark, L. R. D'Addario |
10/07/85 |
503 |
Assignment of Equipment To Racks in the Station Building |
L. R. D'Addario |
10/25/85 |
504 |
Timekeeping at the VLBA Stations |
L. R. D'Addario |
09/17/85 |
505 |
Observation Descriptor |
B. G. Clark |
10/85 |
506 |
Station Building Design Changes; Meeting with A/E |
B. Peery |
10/18/85 |
507 |
Electronics Meeting, November 7, 1985 |
D. Thompson |
11/08/85 |
508 |
Decision Scheme for Phase and Delay Tracking |
J. D. Romney |
11/11/85 |
509 |
Site Group Meeting, 851023 |
C. Wade |
11/11/85 |
510 |
VLBA Station Timekeeping - An Alternative |
B. Clark |
11/20/85 |
511 |
VLBA Tasks for Vertex and Station Room Design |
H. Dill |
11/25/85 |
512 |
Site Group Meeting, 851120 |
C. Wade |
11/25/85 |
513 |
Dual Band (S/X) Bandwidth Synthesis With 8 Channels |
A. E. E. Rogers, D. S. Robertson |
11/22/85 |
514 |
VLBA Electronics Meeting, December 5, 1985 |
D. Thompson |
12/09/85 |
515 |
Third VLBA Design Review |
J. D. Romney |
12/10/85 |
516 |
Standard Interface Boards |
B. Clark |
12/05/85 |
517 |
Humidity and Temperature Control |
H. F. Hinteregger, J. C. Webber |
12/16/85 |
518 |
Bandwidth Synthesis vs. Channelization |
L. R. D'Addario |
12/13/85 |
519 |
RFI Survey for the VLBA Locations on the Island of Hawaii |
J. Oty |
11/85 |
520 |
Site Group Meeting, 851218 |
C. Wade |
12/19/85 |
521 |
VLBA Teleconference Schedules |
C. Williams |
12/30/85 |
522 |
Phase Switching, Fringe Rotation, and the Orthogonality of Walsh Functions and Square Waves |
A. R. Thompson, J. Granlund |
01/02/86 |
523 |
Distribution of VLBA Memos |
C. Williams |
01/10/86 |
524 |
VLBA & AT Long Baseline Array Correlator/LO Options |
M. S. Ewing |
01/08/86 |
525 |
VLBA Electronics Meeting, January 9, 1986 |
D. Thompson |
01/13/86 |
526 |
Site Group Meeting, 860129 |
C. Wade |
01/29/86 |
527 |
VLBA Memos Distributed During January, 1986 |
C. Williams |
02/06/86 |
528 |
Jan. 28, 1986 Meeting Summary |
R. C. Walker |
01/28/86 |
529 |
Required Instruments for the VLBA Weather Stations |
B. G. Clark |
02/07/86 |
530 |
Vertex Room Register Duct Placement |
H. Dill |
02/07/86 |
531 |
VLBA Electronics Meeting, Feb. 6, 1986 |
D. Thompson |
02/11/86 |
532 |
Agenda for March 3 Meeting |
K. I. Kellermann |
02/19/86 |
533 |
VLBA Memos Distributed During February, 1986 |
C. Williams |
02/28/86 |
534 |
Site Group Meeting, 860226 |
C. Wade |
02/27/86 |
535 |
More on a VLBA Antenna in Green Bank |
C. Walker |
02/17/86 |
536 |
Construction Order |
R. C. Walker |
03/10/86 |
537 |
Systems Engineering |
D. Thompson |
03/14/86 |
538 |
VLBA Electronics Meeting, March 6, 1986 |
D. Thompson |
03/11/86 |
539 |
A Comment on Fringe Rotation |
J. Granlund |
03/12/86 |
540 |
Site Group Meeting, 860326 |
C. Wade |
03/27/86 |
541 |
VLBA Memos Distributed During March, 1986 |
C. Williams |
04/02/86 |
542 |
Accurate Coordinates for the First Four VLBA Stations |
C. M. Wade |
03/31/86 |
543 |
Proposed Cables for the VLBA Receiving Station |
A. R. Thompson |
04/03/86 |
544 |
VLBA Electronics Meeting, April 3, 1986 |
D. Thompson |
04/07/86 |
545 |
VLBA Memos Distributed During April, 1986 |
C. Williams |
05/01/86 |
546 |
Site Group Meeting, 860430 |
C. Wade |
05/01/86 |
547 |
VLBA Science Meeting, June 9, 1986 |
K. I. Kellermann |
05/20/86 |
548 |
VLBA Electronics Meeting, May 8, 1986 |
D. Thompson |
05/21/86 |
549 |
Array-Control Text Stream |
D. King |
05/20/86 |
550 |
Pie Town Test Plan |
C. Walker |
05/20/86 |
551 |
VLBA Memos Distributed During May, 1986 |
C. Williams |
05/30/86 |
552 |
Station Timing System |
A. R. Thompson |
05/30/86 |
553 |
Site Group Meeting, 860528 |
C. Wade |
05/29/86 |
554 |
VLBA Electronics Meeting, June 5, 1986 |
D. Thompson |
06/06/86 |
555 |
Monitor/Control Bus ID Assignments |
B. G. Clark |
05/86 |
556 |
Choice of Frequency Range for VLBA Sband Receiver |
P. C. Crane, W. D. Brundage, W. C. Erickson, R. M. Price |
06/09/86 |
557 |
VLBA Specification Summary |
J. D. Romney |
06/13/86 |
558 |
VLBA Meeting Schedules |
C. Williams |
06/27/86 |
559 |
VLBA Memos Distributed During June 1986 |
C. Williams |
06/30/86 |
560 |
VLBA Electronics Meeting, July 10, 1986 |
D. Thompson |
07/14/86 |
561 |
Monitor/Control Bus ID Assignments |
B. G. Clark |
07/22/86 |
562 |
Site Group Meeting, 860625 |
C. Wade |
07/08/86 |
563 |
RFI Survey for the VLBA West Indies Laboratory |
J. Oty |
06/86 |
564 |
Data Processing Meeting 22 July 1986 |
W. D. Cotton |
07/23/86 |
565 |
VLBA Memos Distributed During July 1986 |
C. Williams |
07/31/86 |
566 |
Site Group Meeting, 860730 |
C. Wade |
08/31/86 |
567 |
VLBA Electronics Meeting, August 7, 1986 |
D. Thompson |
08/13/86 |
568 |
Relational Databases and VLBA or, Is the VLBA Ready for MIS? |
M. Ewing |
08/07/86 |
569 |
Relational Databases and VLBA Operations, Revisited |
M. Ewing |
08/15/86 |
570 |
September 8 Meeting |
K. I. Kellermann |
08/27/86 |
571 |
VLBA Memos Distributed During August 1986 |
C. Williams |
09/02/86 |
572 |
Site Group Meeting, 860827 |
C. Wade |
08/28/86 |
573 |
VLBA Electronics Meeting, September 4, 1986 |
D. Thompson |
09/05/86 |
574 |
Data Processing Meeting 23 September 1986 |
W. D. Cotton |
09/24/86 |
575 |
Site Group Meeting, 860924 |
C. Wade |
09/25/86 |
576 |
Horizons |
C. Walker |
09/25/86 |
577 |
VLBA Memos Distributed During September 1986 |
C. Williams |
09/30/86 |
578 |
VLBA Electronics Meeting, October 2, 1986 |
D. Thompson |
10/06/86 |
579 |
VLBA Memos Distributed During October 1986 |
C. Williams |
10/31/86 |
580 |
VLBA Electronics Group Meeting, November 6, 1986 |
A. R. Thompson |
11/07/86 |
581 |
Selection of Coaxial Switches |
A. R. Thompson |
11/24/86 |
582 |
VLBA Memos Distributed During November 1986 |
C. Williams |
12/01/86 |
583 |
VLBA Electronics Meeting, December 4, 1986 |
A. R. Thompson |
12/05/86 |
584 |
Testing of the VLBA Electronics at the VLA Site |
A. R. Thompson, D. S. Bagri, A. E. E. Rogers |
12/09/86 |
585 |
Site Group Meeting, 861119 |
C. Wade |
11/25/86 |
586 |
VLBA Teleconference Schedules |
C. Williams |
12/17/86 |
587 |
VLBA Memos Distributed During December 1986 |
C. Williams |
01/05/87 |
588 |
Observer's Interface To the VLBA |
D. King |
01/07/87 |
589 |
VLBA Electronics Meeting, January 6, 1987 |
D. Thompson |
01/08/87 |
590 |
VLBA Systems Group Meeting |
J. D. Romney, A. R. Thompson, R. C. Walker |
11/20/86 |
591 |
Effects of Using Green Bank |
C. Walker |
01/15/87 |
592 |
Site Group Meeting, 870128 |
C. Wade |
02/02/87 |
593 |
VLBA Fringe Phasing Error |
J. Granlund |
02/20/87 |
594 |
VLA/VLBA User Interface Style |
R. Heald, R. Gonzalez |
02/87 |
595 |
Site Group Meeting, 870325 |
C. Wade |
03/26/87 |
596 |
Station Building RF Test |
J. Oty, P. Rhodes, D. Ross |
04/21/87 |
597 |
Site Group Meeting, 870527 |
C. Wade |
05/27/87 |
598 |
Periodic Signal Errors and the FX Correlator |
A. R. Thompson |
05/29/87 |
599 |
VLBA Teleconference Schedules |
C. Williams |
06/10/87 |
600 |
Usage of Monitor/Control Bus Ports |
B. G. Clark |
07/87 |
601 |
Distribution of VLBA Memos |
B. Trujillo |
07/03/87 |
602 |
Site Group Meeting, 870729 |
C. Wade |
07/30/87 |
603 |
The Very Long Baseline Array |
J. D. Romney |
[08/87] |
604 |
Review of the Computer Coordination Meeting, Aug. 18, 1987 |
C. Walker |
08/19/87 |
605 |
Navstar Receivers for Timing and Ionospheric Calibration |
A. R. Thompson |
08/26/87 |
606 |
Diffraction Losses Between Mauna Loa and Mauna Kea |
P. Crane |
09/29/87 |
607 |
Site Group Meeting, 870930 |
C. Wade |
10/09/87 |
608 |
VLBA Memos Distributed July - September, 1987 |
B. Trujillo |
10/05/87 |
609 |
RFI Interference Survey for the VLBA Northeast Site |
J. Oty |
10/87 |
610 |
Northeast Site |
B. Peery |
11/10/87 |
611 |
VLBA Science Group Meeting, December 7, 1987 |
K. I. Kellermann |
11/17/87 |
612 |
Green Bank RFI Environment |
G. Seielstad |
11/17/87 |
612-A |
Corrections and Clarifications to VLBA Memo #612 |
W. Sizemore |
12/01/87 |
613 |
Site Group Meeting, 871125 |
C. Wade |
11/30/87 |
614 |
NE VLBA Antenna |
G. Seielstad |
11/29/87 |
615 |
VLBA Memos Distributed October - November, 1987 |
B. Trujillo |
12/04/87 |
616 |
VLBA Teleconference Schedules |
[Trujillo] |
12/21/87 |
617 |
Site Group Meeting, 880127 |
C. Wade |
01/28/88 |
618 |
Horizons Revisited |
C. Walker |
01/88 |
619 |
VLBA Memos Distributed During December 1987 |
B. Trujillo |
02/04/88 |
620 |
VLBA Memos Distributed During January 1988 |
B. Trujillo |
02/04/88 |
621 |
VLBA Memos Distributed During February 1988 |
B. Trujillo |
03/02/88 |
622 |
A Pulse Calibration Scheme for the VLBA |
A. R. Thompson, D. S. Bagri |
03/21/88 |
623 |
VLBA Power Glitches |
L. Serna |
03/29/88 |
624 |
Site Group Meeting, 870330 |
C. Wade |
03/31/87 |
625 |
VLBA Memos Distributed During March 1988 |
B. Trujillo |
04/04/88 |
626 |
VLBA Station Names, Codes, Numbers |
C. M. Wade |
04/13/88 |
627 |
VLBA Station Names, Codes, Numbers Revistied |
C. M. Wade |
04/22/88 |
628 |
VLBA Memos Distributed During April 1988 |
B. Trujillo |
05/06/88 |
629 |
Frequency Sequences for Reduced Number of Channels, With Applications to the VLBA |
D. B. Shaffer |
04/04/88 |
630 |
VLBA Teleconference Schedules |
[Trujillo] |
06/24/88 |
631 |
VLBA Options: Inexpensive 12.2 GHz Addition |
R. L. Brown |
06/21/88 |
632 |
The VLBA Options List |
J. D. Romney |
05/24/88 |
633 |
VLBA Teleconference Schedules - Revised |
[Trujillo] |
07/15/88 |
634 |
Workstations for Correlator Software Development and Control and [and Related Issues] |
D. Wells |
07/22/88 |
635 |
Correlator Control Computer |
C. Walker |
[07/88] |
636 |
VLBA Memos Distributed May - July, 1988 |
B. Trujillo |
08/04/88 |
637 |
Site Group Meeting, 880928 |
C. Wade |
09/28/88 |
638 |
VLBA Memos Distributed August - October, 1988 |
B. Trujillo |
11/03/2005 |
639 |
VLBA Teleconference Schedules |
B. Trujillo |
12/29/88 |
640 |
VLBA Specification Summary |
J. D. Romney |
01/01/89 |
641 |
VLBA Memos Distributed November 1988 - February 1989 |
B. Trujillo |
03/06/89 |
642 |
VLBA Memos Distributed During March 1989 |
B. Trujillo |
04/05/89 |
643 |
An Overview of the RFI Monitoring System for the VLBA Project |
J. Oty |
[04/89] |
644 |
Accurate Coordinates for VLBA Antennas |
C. M. Wade |
05/12/89 |
645 |
UAI Antenna Drawings |
L. Walker |
06/02/89 |
646 |
VLBA Memos Distributed April and May 1989 |
B. Trujillo |
06/06/89 |
647 |
VLBA Site Addresses and Information |
B. Trujillo |
06/15/89 |
648 |
VLBA Teleconference Schedules |
B. Trujillo |
06/15/89 |
649 |
VLBA Memos Distributed June - July, 1989 |
B. Trujillo |
07/31/89 |
650 |
Code Maintenance Areas on VLBACC |
B. Clark, R. Heald |
09/89 |
651 |
Lightning Damage at Los Alamos |
P. Johnson |
09/25/89 |
652 |
VLBA Memos Distributed August - September, 1989 |
B. Trujillo |
10/06/89 |
653 |
VLBA Memos Distributed October - November, 1989 |
B. Trujillo |
12/04/89 |
654 |
Measurements of RFI from the SOWRBALL Aerostat |
P. J. Napier |
12/16/89 |
655 |
VLBA Meeting Schedules |
B. Trujillo |
12/21/89 |
656 |
Pie Town at 86 GHz |
C. Walker, D. Bagri |
12/21/89 |
656-A |
Pie Town at 86 GHz - Revised |
C. Walker, D. Bagri |
12/28/89 |
657 |
VLBA Memos Distributed December 1989 |
B. Trujillo |
01/03/90 |
658 |
VLBA Site Addresses and Information |
B. Trujillo |
01/22/90 |
659 |
Hurricane Damage on St. Croix, Five Months After |
C. M. Wade |
02/21/90 |
660 |
VLBA Memos Distributed During January and February, 1990 |
B. Trujillo |
03/06/90 |
661 |
User Interaction with the VLBA |
R. C. Walker, J. D. Romney |
04/03/90 |
662 |
VLBA Correlator Operations Layout |
J. D. Romney |
04/10/90 |
663 |
VLBA Meetings - July Through December 1990 |
B. Trujillo |
[06/90] |
664 |
VLBA Memos Distributed March Through May, 1990 |
B. Trujillo |
06/20/90 |
665 |
Lightning Damage at North Liberty |
J. Meadows |
06/26/90 |
666 |
VLBA Sites Addresses and Information |
B. Trujillo |
07/20/90 |
667 |
VLBA Monitor and Control Network |
K. Stetten |
08/23/90 |
668 |
Likely Hosts, Costs and Topology of the VLBA Network |
K. J. Stetten |
08/10/08 |
669 |
VLBA Memos Distributed June through August, 1990 |
B. Trujillo |
09/04/90 |
670 |
Maser Shipping Shock Tests |
L. Beno |
10/24/90 |
671 |
Positions of KP and LA From MKII VLBI |
J. M. Wrobel, J. M. Benson |
10/31/90 |
672 |
VLBA Meeting Schedules |
B. Trujillo |
12/18/90 |
673 |
4-Element Frequency Sequences |
D. B. Shaffer |
11/19/90 |
674 |
Frequency Sequences for Bandwidth Synthesis on the VLBA |
C. Walker |
12/17/90 |
675 |
VLBA Memos Distributed September through December, 1990 |
B. Trujillo |
01/08/91 |
676 |
Decision To Use Only One Data Acquisition Rack at VLBA Sites |
P. Napier |
01/30/91 |
677 |
VLBA Site Addresses and Information |
B. Trujillo |
03/01/91 |
678 |
VLBA Memos January through February, 1991 |
B. Trujillo |
03/06/91 |
679 |
Network Communications Backup |
B. G. Clark |
05/01/90 |
680 |
VLBA Meetings Schedules |
B. Trujillo |
06/25/91 |
681 |
VLBA Memos Distributed March through June, 1991 |
B. Trujillo |
07/11/91 |
682 |
Notes On Use of the VLBA Monitor and Control Bus |
L. R. D'Addario |
09/26/91 |
683 |
VLBA Site Addresses and Information |
B. Trujillo |
11/20/91 |
684 |
Memos Distributed October - November 1991 |
B. Trujillo |
[11/91] |
685 |
1992 VLBA Teleconference Schedules |
B. Trujillo |
[12/91] |
685-A |
Revised - 1992 VLBA Teleconference Schedules |
B. Trujillo |
01/02/92 |
686 |
VLBA Memos Distributed November-December, 1991, January, 1992 |
B. Trujillo |
02/03/92 |
687 |
VLBA Memos Distributed February - May, 1992 |
B. Trujillo |
06/17/92 |
688 |
1992 VLBA Teleconference Schedules |
B. Trujillo |
06/23/92 |
689 |
VLBA Site Addresses and Information |
B. Trujillo |
11/03/92 |
690 |
1993 VLBA Meetings Schedules |
B. Trujillo |
12/18/92 |
691 |
A Proposal To Use Pulsecal Amplitudes To Estimate Phase Shift Variations Due To Atmosphere |
D. S. Bagri |
03/31/93 |
692 |
VLBA Meetings - July Through December 1993 |
[Trujillo] |
[12/93] |
693 |
MK VLBA Station Ice Plan |
J. Oty |
12/13/93 |
694 |
VLBA Site Addresses and Information |
B. Trujillo |
12/17/93 |
695 |
1994 VLBA Meetings |
B. Trujillo |
01/06/94 |
696 |
1994 VLBA Meetings (2nd Half) |
[Trujillo] |
[06/94] |
697 |
High Dynamnic Range Imagining with the VLBA |
D. S. Briggs, R. J. Davis, J. E. Conway, R. C. Walker |
07/14/94 |
697-A |
Revision: High Dynamnic Range Imagining with the VLBA |
D. S. Briggs, R. J. Davis, J. E. Conway, R. C. Walker |
07/23/94 |
698 |
Operations With Multiple Projects Per Tape |
B. G. Clark |
05/97 |
699 |
Testing Helium Compressor Flow Capacity for Possible X-Band Upgrade |
R. Long, D. Urbain, B. Simkin |
11/06/20 |