Memo Number |
Title |
Author(s) |
Date |
1 |
12-M Telescope Working Group (36-Foot Upgrading) |
H. Hvatum |
03/13/81 |
2 |
Notes on Improving the 36-Foot Telescope |
J. W. Findlay |
10/24/73 |
3 |
Further Measurements on the 36-ft Surface |
J. Payne, J. Hollis |
05/14/75 |
4 |
Antenna Efficiency Tests |
B. L. Ulich |
02/04/76 |
5 |
36' Telescope Mean Surface Computer Study |
J. Hollis |
08/20/76 |
6 |
Modification of 36-foot Surface |
B. L. Ulich |
01/19/78 |
7 |
A New Surface for the 36-ft Telescope? |
M. A. Gordon |
04/17/80 |
8 |
Resurface the 36-ft Telescope? |
M. Gordon |
11/26/80 |
9 |
Summary of Surface RMS Errors |
L. King |
12/12/80 |
10 |
Upgrading the 36' Reflector |
W. G. Horne |
01/09/81 |
11 |
The 11-Meter Telescope Stability Tests |
J. W. Findlay, J. M. Payne, J. N. Ralston |
03/23/81 |
12 |
The 11-Meter Telescope |
J. W. Findlay |
03/07/81 |
13 |
The 36' Telescope |
J. M. Payne |
03/10/81 |
14 |
11 M Performance |
J. M. Payne |
03/23/81 |
15 |
Notes on the 12-m Telescope Meeting; March 24, 1981, 1330 EST |
J. W. Findlay |
03/81 |
16 |
Results of Spherical Aberration Tests on NRAO 11-M Telescope |
B. L. Ulich |
03/20/81 |
17 |
36' "VLA" Design |
L. King |
04/10/81 |
18 |
Rough Estimate 12M |
W. G. Horne |
04/14/81 |
19 |
12 M Receiver Installation |
J. Payne |
04/16/81 |
20 |
Weekly Project Meetings |
H. Hvatum |
04/21/81 |
21 |
PERT |
H. Hvatum |
04/22/81 |
22 |
12-Meter Antenna |
D. Ross |
04/22/81 |
23 |
12-Meter Telescope Meeting No. 2; April 14, 1981, 1300 EST |
J. W. Findlay |
04/81 |
24 |
12-M Telescope Meeting No. 3; April 28, 1981, 1400 EST |
- |
04/28/81 |
25 |
12 M Telescope Receiver Locations |
L. King |
04/28/81 |
26 |
Receivers Installation |
W-Y. Wong |
04/30/81 |
27 |
Errors in Encoders |
J. Payne |
04/30/81 |
28 |
The Surface of the 12-m Telescope |
J. W. Findlay |
05/01/81 |
29 |
12-M Telescope Meeting No. 4; May 5, 1981 |
- |
05/81 |
30 |
The 11 M Azimuth Bearing |
J. M. Payne |
05/05/81 |
31 |
12-M Telescope Meeting No. 4 [sic]; May 12, 1981 |
- |
05/81 |
32 |
Ammendment To 12 Meter Memo #22 |
D. Ross |
05/12/81 |
33 |
Preliminary Design of Optical System and Receiver System for the 12 M Antenna |
J. M. Payne |
05/13/81 |
34 |
12M Antenna |
- |
04/12/81 |
35 |
Letter of Solicitation |
J. Marymor |
05/21/81 |
36 |
Setting the Surface of the 12 Meter Telescope |
J. W. Findlay |
05/14/81 |
37 |
Support Bolts for ESSCO Panels |
W. Horne |
05/18/81 |
38 |
12-meter Telescope Meeting No. 5 [sic]; May 19, 1981 |
- |
05/81 |
39 |
A Competing Proposal for One 12-M Reflector Structure |
W-Y. Wong |
05/26/81 |
40 |
12-meter Telescope Meeting No. 6 [sic]; May 26, 1981 |
- |
05/81 |
41 |
Letter of Interest |
L. E. Rhoades, Electronic Space Systems Corporation |
05/29/81 |
42 |
Response To an Inquiry by W. Horne |
M. J. Brenner, Electronic Space Systems Corporation |
05/21/81 |
42A |
Surface Measurement of 12 Meter Diameter Reflector Panels |
M. J. Brenner, Electronic Space Systems Corporation |
05/13/81 |
43 |
Schedule for NRAO's Tuesday Conferences |
P. R. Bisbano, The Darome Connection |
05/18/81 |
44 |
Possible Factors in the Selection of a Back Structure Design and Quadrupod Geometry |
M. A. Gordon |
06/02/81 |
45 |
Errors in Encoders, Addition To Memo # 27 |
J- M. Payne |
06/05/81 |
46 |
12M Antenna |
- |
06/09/81 |
47 |
12-Meter Telescope Meeting No. 8 [sic]; June 9, 1981 |
- |
06/81 |
48 |
Points for discussion - June 16th '81 |
J. W. Findlay |
06/12/81 |
49 |
Response To Memo #48 |
W. Horne |
06/15/81 |
50 |
Request for Proposal # 228 - Millimeter Wave Telescope Panels |
J. Marymor |
06/10/81 |
51 |
12-m Telescope Meeting No. 9 [sic]; June 16, 1981 |
J. W. Findlay |
06/81 |
52 |
The 12-m Telescope Measuring and Setting at Green Bank |
J. W. Findlay |
06/18/81 |
53 |
12-m Telescope Meeting No. 10 [sic]; June 23, 1981 |
- |
06/81 |
54 |
Plan ~ 12M Antenna |
W. Horne |
06/81 |
55 |
Technical Proposal for Millimeter Wave Telescope Panels |
S. M. Cuevas, Electronic Space Systems Corporation |
06/24/81 |
56 |
ESSCO Proposal E-5817; NRAO Request for Proposal # 228 |
J. Marymor |
07/07/81 |
57 |
Schedule A - Statement of Work |
- |
07/81 |
58 |
12-m Telescope Meeting No. 11 [sic] |
H. Hvatum |
07/21/81 |
59 |
Revised Meeting Schedule |
H. Hvatum |
07/22/81 |
60 |
12-m Telescope Meeting No. 12 [sic]; July 21, 1981 |
- |
07/81 |
61 |
12M Antenna |
- |
07/28/81 |
62 |
12 Meter Antenna Project: Projected Manpower Requirements Back-Up Structure Assembly |
W. G. Horne |
07/23/81 |
63 |
12 Meter Elev. STRU |
L. King |
08/04/81 |
64 |
12-m Telescope Meeting No. 13 [sic]; August 4, 1981 |
J. W. Findlay |
08/81 |
65 |
NSF Approval of Subcontract No. AUI-197 |
S. J. Franko, NSF |
08/05/81 |
66 |
New Project Numbers |
J. P. Lagoyda |
08/06/81 |
67 |
Electronic Work To Support New Surface |
J. M. Payne |
08/06/81 |
68 |
12-Meter BUS/Receiver Mounting |
D. Ross |
08/07/81 |
69 |
New Project Numbers |
J. R. Gibb |
08/19/81 |
70 |
Prime Contract No. NSF AST 79-08925 |
- |
08/17/81 |
71 |
12 M Selection Mirror |
J. Payne |
08/81 |
72 |
12-meter Telescope Meeting No. 15; September 1, 1981 |
- |
09/81 |
73 |
Aperture Blockage of the 12-M Telescope |
M. A. Gordon |
09/08/81 |
74 |
36 Foot Telescope Improvements |
- |
08/81 |
75 |
Specifications: Reflector Structure - 12 Meter Antenna |
- |
09/01/81 |
76 |
12-Meter Telescope Meeting No. 16; September 15, 1981 |
J. W. Findlay |
09/81 |
77 |
12M Antenna |
- |
09/17/81 |
78 |
Request for Proposal # 231 |
J. Marymor |
09/22/81 |
79 |
Adaptation of the Present 9.5MM Cassegrain Receiver To The Proposed 12 Meter Telescope |
R. Freund |
09/15/81 |
80 |
12-Meter Telescope Meeting No. 17; September 22, 1981 |
J. W. Findlay |
09/81 |
81 |
Reference: AUI-197 |
S. M. Cuevas, Electronic Space Systems Corporation |
09/24/81 |
82 |
Revision 'A' of Report Sent July 1, 1981 |
M. J. Brenner, Electronic Space Systems Corporation |
09/29/81 |
83 |
12-Meter Telescope Meeting No. 18; October 6, 1981 |
- |
10/81 |
84 |
Data Collection for 12-m Measuring |
J. Findlay |
10/08/81 |
85 |
Reference Jig, Drawing No. 87D00005 |
J. M. Hamed |
09/03/81 |
86 |
The Reference Jig |
J. W. Findlay |
10/08/81 |
87 |
12-meter Measuring System ADIOS as a Data Taker |
J. W. Findlay |
10/14/81 |
88 |
36 Foot Telescope Improvements |
- |
09/30/81 |
89 |
12M Antenna |
- |
10/19/81 |
90 |
Estimated Costs for 12 Meter Inductosyns |
R. K. Moore |
10/26/81 |
91 |
12-meter Telescope Meeting No. 19; October 20, 1981 |
J. W. Findlay |
10/81 |
92 |
A New Paper by Mehdi Zarghamee |
L. E. Rhoades, Electronic Space Systems Corporation |
10/30/81 |
93 |
12-meter Telescope Meeting No. 20; November 3, 1981 |
J. W. Findlay |
11/81 |
94 |
Machine Shop Time |
J. Payne |
11/04/81 |
95 |
Time Schedule 12 Meter Inductosyns |
B. Peery |
11/04/81 |
96 |
12M Antenna |
- |
11/10/81 |
97 |
Subreflector Movement for 12 M Antenna |
J. Payne |
11/09/81 |
98 |
Assembly and Measurement of 12 Meter Backup Structure in Warehouse at Green Bank |
B. Peery |
11/13/81 |
99 |
36 Foot Telescope Improvements |
- |
10/31/81 |
100 |
Transport of 36' Panels To Green Bank |
F. Beverage |
11/23/81 |
101 |
Update Cost Estimates for 12-m Project |
H. Hvatum |
11/18/81 |
102 |
Changes in the Computer System for the 12-m Surface |
M. A. Gordon |
11/19/81 |
103 |
12M Antenna |
- |
12/81 |
104 |
ESSCO Measurements of the First 12-meter Panel |
- |
11/13/81 |
105 |
Tolerances for Subreflector Positioning on the 12-m Telescope |
R. Fisher, J. Payne |
12/02/81 |
106 |
36 Foot Telescope Improvements |
- |
11/30/81 |
107 |
12-Meter Telescope Meeting No. 23; December 15, 1981 |
G. M. Peery |
12/81 |
108 |
Surface panel and the Feed Support Structure |
L. J. King |
12/24/81 |
109 |
12-Meter Telescope Meeting No. 24; December 29, 1981 |
- |
12/81 |
110 |
Meeting Schedule |
H. Hvatum |
01/06/82 |
111 |
A Close Look at the First Set of ESSCO Plate Measurements |
W-Y. Wong |
01/04/82 |
112 |
Setting the 12-Meter Surface |
J. W. Findlay |
01/04/82 |
113 |
New Project |
M. Balister |
12/31/81 |
114 |
Revision of 12 Meter Telescope Project Numbers/Account 13141 |
J. P. Lagoyda |
12/31/81 |
115 |
NSF AST 79-08925 - Notification of Proposed Procurement |
J. Marymor |
01/05/82 |
116 |
ESSCO Progress in Surface Plate Manufacture |
- |
01/05/82 |
117 |
Meeting - G.B. Manpower, 12 Meter Project |
B. Peery |
01/06/82 |
118 |
Work for Shop - 12 Meter Project |
B. Peery |
01/11/82 |
119 |
Letter Regarding Impressions After Observations |
P. R. Schwartz, Naval Research Laboratory |
12/22/81 |
120 |
36 Foot Telescope Improvements |
- |
12/31/81 |
121 |
AUI-197 (J1946) - Change Order #1 |
J. Marymor |
01/15/82 |
122 |
12M Antenna |
- |
01/82 |
123 |
12-meter Telescope Meeting No. 25; January 19, 1982 |
- |
01/82 |
124 |
16-Channel Multiplexer for Use with Apple/ADIOS |
D. Schiebel |
01/19/82 |
125 |
Panel Supports ~ 12M Antenna |
W. Horne |
01/21/82 |
126 |
Subcontract AUI-200; Letters from CenFab dated Jan 7, 1982 |
W. Horne |
01/19/82 |
127 |
Contract AUI-200 - Proposed Progress Payment Schedule |
J. Marymor |
01/27/82 |
128 |
Subcontract AUI-200 - Approval of Welding Materials |
J. Marymor |
01/27/82 |
129 |
Panel Supports |
J. W. Findlay |
02/04/82 |
130 |
Letter of Response To Dr. Schwartz |
J. Payne |
02/04/82 |
131 |
12 Meter Resurfacing |
- |
01/31/82 |
132 |
12 Meter Panel Support Analysis |
W. Horne |
02/11/82 |
133 |
Receiver Costs for 12-m |
J. M. Payne |
02/12/82 |
134 |
Final Acceptance Record |
A. M. Castellano, Electronic Space Systems Corporation |
02/10/82 |
135 |
12M Panel Support Assembly |
W. G. Horne |
02/18/82 |
136 |
9 Sketches of the Proposed Receiver Mount for the 12 Meter Telescope |
D. Ross |
02/08/82 |
137 |
12M Antenna |
- |
03/82 |
138 |
Sketches of Modified Horizontal Receiver Mounting |
D. Ross |
03/06/82 |
139 |
Status of the 12M Back-Up Structure |
W. Horne |
03/09/82 |
140 |
The Story of the Azimuth Bearing of the 36-ft Telescope |
M. A. Gordon |
03/08/82 |
141 |
36' Azimuth Bearing |
W. Horne |
03/09/82 |
142 |
12 Meter Subreflector Translation Stage |
P. J. Rhodes |
03/12/82 |
143 |
Receiver Mounting in Positions 3 & 4 |
D. Ross |
03/19/82 |
144 |
Startup of 12-m |
J. M. Payne, P. J. Rhodes |
03/29/82 |
145 |
Authorization To Begin Construction of the Crane Parking Area |
P. J. Rhodes |
03/17/82 |
146 |
12-Meter Telescope Meetings: March 23-25, 1982 |
B. Peery |
04/01/82 |
147 |
Design of the Feed Support Legs |
M. A. Gordon |
04/05/82 |
148 |
12 Meter Resurfacing |
- |
03/82 |
149 |
Apeture Geometry Blockage |
L. J. King |
04/12/82 |
150 |
Letter of Thanks To Leonard S. Baker |
J. W. Findlay |
04/12/82 |
151 |
Receiver Mounting for 12 M Project |
J. M. Payne |
04/15/82 |
152 |
Weighted Aperture Blockage of the 12-m Telescope |
M. A. Gordon |
04/15/82 |
152A |
Correction To Memorandum 152 |
M. A. Gordon |
04/30/82 |
153 |
The First Looks at the Reference Jig |
J. Findlay |
04/26/82 |
155 |
12M Antenna |
- |
05/82 |
156 |
A Sunshield for the 12-m Telescope |
M. A. Gordon |
05/03/82 |
157 |
12-Meter Panel Edge Positions |
J. W. Findlay |
05/04/82 |
158 |
Subcontract AUI-200 Change Order #1 |
J. Marymor |
05/05/82 |
159 |
12 Meter Resurfacing |
- |
04/30/82 |
160 |
Holographic Measur[e]ment of the 12-m Surface |
J. Payne |
05/10/82 |
161 |
Cost Estimate |
H. Hvatum |
05/13/82 |
162 |
12M Template Deflection Analysis |
L. J. King |
05/14/82 |
163 |
Temperature Transducer Multiplexed Interface |
R. Lacasse, G. Grove |
05/13/82 |
164 |
Deflections of the Reference Jig tilted at 17.886° |
L. J. King |
05/20/82 |
165 |
Possible Fix Up of the 12m Drive |
J. M. Payne |
05/19/82 |
166 |
RFQ5-1982 |
D. A. Webb |
04/27/82 |
167 |
Additions or Changes To RFQ 5-1982 Resulting From Preproposal Conference and Site Survey |
D. A. Webb |
05/06/82 |
168 |
12-m Meeting Schedule |
H. Hvatum |
06/07/82 |
169 |
12M Antenna |
- |
06/82 |
170 |
New Allocations |
H. Hvatum |
06/09/82 |
171 |
Arrangements for Site Assembly Crew - 12 Meter Antenna-Tucson |
W. Horne |
06/02/82 |
172 |
12 Meter Resurfacing |
- |
05/31/82 |
173 |
Mirrors for 12-meter Optics |
B. Peery |
06/02/82 |
174 |
Letter and Technical Considerations for Holographic Measurement of the NRAO 12-Meter Surface |
M. Balister, C. R. Moore |
06/17/82 |
175 |
12M Antenna |
- |
06/82 |
176 |
Letter Regarding Deformable Mirrors for Adaptive Optics |
J. H. Lang, MIT |
06/21/82 |
177 |
Letter Regarding LES-8/9 Use |
W. W. Ward, MIT |
06/22/82 |
178 |
Wider Beam Throws for Continuum Observing with the 12 Meter |
F. Owen |
06/18/82 |
179 |
12 Meter Resurfacing |
- |
06/30/82 |
180 |
Thermal Behavior of 12M Reflector Structure in Green Bank |
L. J. King |
08/02/82 |
181 |
12-m Work Schedule on Kitt Peak |
H. Hvatum |
08/10/82 |
182 |
12M Reflector Edge Deflections |
L. J. King |
08/10/82 |
183 |
12M Receiver Mounting |
L. King |
08/10/82 |
184 |
Financial Report for the 12-m Project |
H. Hvatum |
08/11/82 |
185 |
Letters Regarding Fixture Measurements |
J. W. Findlay |
07/27/82 |
186 |
12M Resurfacing Project |
- |
07/31/82 |
187 |
Measuring the Reference Jig — Phase 1 |
J. W. Findlay |
08/21/82 |
188 |
NRAO Access To LES-8/9 |
- |
08/18/82 |
189 |
Correcting Template Sensor Readings Using Measurements of the Reference Jig |
J. W. Findlay, L. King |
08/27/82 |
190 |
Receiver Mounting Structures |
L. J. King |
09/02/82 |
191 |
12 Meter Resurfacing Project |
- |
08/31/82 |
192 |
12M Surface Errors Due To Gravitational Forces |
L. J. King |
09/24/82 |
193 |
12M Surface Radial Profile For 100# At Edge |
L. J. King |
09/28/82 |
194 |
Analysis of 12M Reference Jig on 2 Supports |
L. J. King |
10/04/82 |
195 |
12M Weight and Moments of Inertia |
L. J. King |
11/02/82 |
196 |
The 12-Meter as of October 13-14 1982 |
- |
10/82 |
197 |
Panel and Antenna Dimensions ~ 12M |
W. Horne |
10/22/82 |
198 |
12 Meter Resurfacing Project as of September 30, 1982 |
- |
09/30/82 |
199 |
12 Meter Resurfacing Project as of October 31, 1982 |
- |
10/31/82 |
200 |
Special 12-m Meeting - November 23, 1982 |
H. Hvatum |
11/17/82 |
201 |
12 M Receivers |
J. Payne |
11/17/82 |
202 |
Holographic Antenna Measurements: Further Technical Considerations |
L. R. D'Addario |
11/82 |
203 |
Reflector Edge Deflections Due To 4000# Additional Counterweight (12M Added CTWT Effects) |
L. J. King |
11/30/82 |
204 |
Surface Adjustments For Gravitational Forces |
L. J. King |
11/30/82 |
205 |
12 Meter Resurfacing Project As of November 30, 1982 |
- |
11/30/82 |
206 |
Completed Projects |
M. Balister, H. Hvatum |
12/27/82 |
207 |
12M Telescope Performance Approximately Half What the Measurement System Suggests |
J. W. Findlay |
12/28/82 |
208 |
Peak Gain of a Cassegrain Antenna with Secondary Position Adjustment |
M. S. Zarghamee |
12/30/82 |
209 |
Meeting on January 10, 1983 |
H. Hvatum |
01/03/83 |
209A |
Meeting on January 10, 1983 - Change in Telephone Number |
H. Hvatum |
01/06/83 |
210 |
1983 Meeting Schedule |
H. Hvatum |
01/06/83 |
211 |
12 Meter Resurfacing Project as of December 31, 1982 |
- |
12/31/82 |
212 |
Summary of 12M Radiometric Measurements for the Period November 24, 1982 thru January 4, 1983 |
J. Payne, J. Findlay |
01/13/83 |
213 |
12M Radiometric Measurements After Panels Adjusted To Take Out Main Error in Reference Jig |
J. Payne, J. Findlay |
01/24/83 |
214 |
12 Meter Resurfacing Project |
- |
01/31/83 |
215 |
Speed Letter |
W. W. Ward, MIT |
06/12/82 |
216 |
1.33 mm Prime Focus Results |
J. Payne, J. Findlay |
02/22/83 |
217 |
The 12-Meter Telescope: A Persistent Profile Error Near Sensor #6 |
J. W. Findlay |
02/20/83 |
218 |
22 Bit Shaft Angle To Digital Converter System |
R. W. Freund |
03/10/83 |
219 |
Focal Movements vs. Elevation Angles |
L. J. King |
03/13/83 |
220 |
The 12-Meter Telescope Profile Error Near Sensor 6: Comments on Memo No. 217 |
W. Horne |
03/11/83 |
221 |
12 Meter Resurfacing Project |
- |
02/28/83 |
222 |
12 Meter Resurfacing Project |
- |
03/31/83 |
223 |
New Elevation Drive System |
B. Peery |
04/27/83 |
224 |
Slides of the 12-Meter |
J. W. Findlay |
04/28/83 |
225 |
Meeting Frequency |
H. Hvatum |
04/29/83 |
226 |
12 Meter Resurfacing Project |
- |
04/30/83 |
227 |
12 Meter Resurfacing Project |
- |
05/31/83 |
228 |
Sun-Screen Fabric |
D. Ross |
06/20/83 |
229 |
RMS Calculations For 08/04/1983 Survey |
L. King |
08/10/83 |
230 |
12-m Meeting Schedule for Remainder of 1983 |
H. Hvatum |
08/18/83 |
231 |
12-Meter Antenna Performance Over First Observing Period (March 21 To June 30, 1983) |
R. Howard |
08/26/83 |
232 |
Letter To M. Gordon |
R. Hills, Cambridge |
08/18/83 |
233 |
Membrane Material Development |
R. L. T. Street |
05/17/83 |
234 |
Cancellation of 12-meter Meeting - 12/27/83 |
H. Hvatum |
12/05/83 |
235 |
RMS Surface Accuracy and Zero-Frequency Efficiency |
M. A. Gordon, R. J. Howard |
11/21/83 |
236 |
The Edge-Balls Re-Measured |
J. W. Findlay |
12/02/83 |
237 |
Holographic Measurement of the 12m Surface Preliminary Report |
A. N. Lasenby |
12/19/83 |
238 |
Status of 12-m System |
J. Payne, C. Salter |
01/19/84 |
239 |
12-m Telescope Calibration |
J. M. Payne, P. J. Rhodes, C. J. Salter, E. B. Stobie |
03/26/84 |
240 |
12-m Telescope Calibration |
J. M. Payne, C. J. Salter |
04/15/84 |
241 |
Memo Regarding Various Topics |
P. R. Jewell, E. B. Stobie |
12/19/85 |
242 |
Continuum Digital Backend |
P. R. Jewell |
04/17/87 |
243 |
Lenses for 200-360 GHz |
J. Payne |
07/07/87 |
244 |
Changes for the 1988-89 Observing Season |
P. R. Jewell |
09/29/88 |
245 |
Mechanical Hysteresis in Feedleg Sag |
P. R. Jewell |
05/17/89 |
246 |
Telescope Pointing Accuracy |
P. R. Jewell |
06/12/89 |
247 |
12 m Structural Tilt Measurements |
P. R. Jewell, T. K. White |
07/09/91 |
248 |
Fourier Transforms of 12 m Structural Tilt Measurements |
T.K. White, P. R. Jewell |
08/06/91 |
249 |
Recommendations For Feed Leg Ventilation |
J. W. Lamb |
07/31/92 |
250 |
Evaluation of Feedleg Insulation |
P. R. Jewell |
07/31/92 |